-
installer
HRC
70
35kW HIGH TEMPERATURE HEAT PUMP
manual
-
-
installer
HRC
70
35kW HIGH TEMPERATURE HEAT PUMP
manual
-
22
23
This form is to given to the electricity provider for all preliminary evaluation for the installation of an HRC Heat Pump in case of an
insufficient power grid.
This table contains information on both electrical and technical data about the HRC Heat Pump.
This technical data is provided in the table § «
Connecting the HRC
70
Heat Pump to the power supply
».
The electricity provider can then proceed to increase the power grid if necessary.
A7 - Electricity provider information form
Name of client
Address
Client reference number on electricity bill
Name and address of installer
(attach a copy of mandate)
Connections
Single-phase
o
Three-phase
o
*
Circuit breaker
Setting : ________A
Heat Pump (HP)
Type de pump
Single-phase
o
Three-phase
o
*
Make, model, and reference number
______________________________________________________________
Type of compressor (without back-up heating)
Single-phase
o
Three-phase
o
*
Nominal heating capacity of the Heat Pump
without elements for back-up heating (kVA)
________(kVA) *
Or
Or
Heat Pump nominal current without elements for
back-up heating (A)
________(A) *
Heat Pump start-up curent (A)
________(A) *
Heat Pump impedence (Z
max
)
declared by the
manufacturer
________(
V
)
Heat Pump power regulating mode
Fixed speed
o
Variable speed
o
Is there a start-up support system in place for fixed-
speed systems?
Yes
o
*
No
o
*
-
Elements for heating back-up
Single-phase
o
Three-phase
o
*
________(kVA)
* mandatory fields