
Protected by copyright. Copying for private or commercial purposes, in part or in whole, is not
permitted unless authorised by AUDI AG. AUDI AG does not guarantee or accept any liability
with respect to the correctness of information in this document. Copyright by AUDI AG.
– Renew bolts for sump (top section).
– Fit sump (top section) paying attention to dowel sleeves and
– Tighten bolts -1 ... 7- in two stages as follows.
1.
Tighten bolts in diagonal sequence to 5 Nm.
2.
Turn bolts 90° further in diagonal sequence.
Remaining installation steps are carried out in reverse sequence;
note the following:
– Install oil pump
.
– Install sump (bottom section)
– Install coolant pipe (front)
– Install alternator ⇒ Electrical system; Rep. gr. 27
– Install timing chain cover (bottom)
.
– Install crankshaft oil seal (gearbox end)
– Install intake manifold ⇒ Rep. gr. 24 .
– Install timing chain covers (left and right)
.
.
– After installing engine, fill up with engine oil and check oil level
⇒ Maintenance ; Booklet 404 .
Tightening torques
♦
⇒ Fig. ““Sump (top section) - tightening torque and se‐
1.7
Oil retention valve and spray nozzle valve - exploded view
Audi A8 2003 ➤
10-cylinder direct petrol injection engine (5.2 ltr. 4-valve), mechanics - Edition 10.2013
1. Lubrication system
173