
Technician Procedures
SuperTrak™ GEN3 System Operation and Maintenance Manual
215
Rev. 9 (12-2021)
Align a Pallet Encoder Strip Assembly
Each pallet encoder assembly contains two (2) encoder strips: a primary encoder
strip, and a secondary encoder strip. Each encoder strip is aligned differently. This
procedure describes how to align both encoder strips; however, the secondary
encoder strip is factory-aligned, and should not require adjustment.
Align a pallet encoder strip assembly if the encoder strip is removed during
maintenance, or if the pallet position faults regularly occur on the curved section.
The following diagram describes the setup tools that are used during this
procedure.
• Improper use of a pallet setup fixture may cause damage to the
pallets or tools.
• Do not move or adjust a pallet setup fixture without the assistance of
a trained technician.
• Remove all removable locating plates before operating the SuperTrak
conveyance platform.
• Pallet encoder strip assembly alignment must be completed on a
straight section.
• Adjust pallet encoder strips consistently to improve pallet-to-pallet
repeatability.
A
Primary encoder
strip
B
Secondary encoder
strip
A
Pallet setup adjustable chip finder
(chip finder)
B
Pallet setup stationary mount
(stationary mount)
C
Adjust bock (1 of 2)
D
Top thumb screw (1 of 2)
E
Pallet setup removable locate
(removable locate)
F
Side thumb screw
Содержание SuperTrak GEN3
Страница 1: ...Rev 9 December 2021...
Страница 2: ......
Страница 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Страница 6: ......
Страница 12: ...This page is intentionally blank...
Страница 30: ...This page is intentionally blank...
Страница 58: ...This page is intentionally blank...
Страница 296: ...This page is intentionally blank...
Страница 300: ...This page is intentionally blank...
Страница 364: ...This page is intentionally blank...
Страница 366: ...This page is intentionally blank...