Electronic Controls & Startup Procedures

before the lamp has to be replaced.
• DAY LED (Orange)- Number of days remaining before

the lamp has to be replaced.
• ALARM LED (Red)- Indicates a problem with the U.V.

Lamp (lamp may be out or beyond its rated life). Blinking

decimal point indicates a properly functioning unit.

Negative number indicates the lamp is beyond its rated

life.
• LO- Indicates the lamp is out and must be replaced.

Beeping Alarm- Indicates problem or lamp life
will expire soon. Continuous Alarm- Lamp has expired or 

is off
• SILENCE ALARM- Press the reset button. There are a

limited number of snoozes allowed.
• NEW LAMP RESET- Press and hold RESET button

after 8 seconds “re” will appear, continue
holding until 12 appears on the display.

OPERATING INSTRUCTIONS
Your U.V. System is equipped to provide a continuous 

monitoring system of the U.V. lamp operational status. This 

is also equipped with an internal and external fused surge 

protection system. This solid state electronic circuit board 

provides the latest in U.V. lamp monitoring technology. 

U.V. LAMP CONTROL START UP PROCEDURE
1. Make sure the U.V. lamp is inserted per instructions

into the quartz sleeve and U.V. chamber. Then plug the

U.V. lamp into the end  lamp connectors.

2.

Plug the unit into a 1

1

0volt wall plug outlet.

3.

Upon start up the U.V. lamp Detector and Timer

circuit board will perform a self diagnostic test.
• Quick Beep

• Software version is displayed (Fig. 1)
• Watts:(Fig 2)

25gpm = approx 70

• The number 12 is displayed representing 12 months

remaining
• Green LED on, blinking decimal point to the right =

System Check OK, U.V. System is operational. (Fig. 3)

RESET LAMP
Set the 1 Year Lamp Timer – WITH NEW U.V. LAMP
Make sure the control box is plugged into the wall outlet 

and the U.V. lamp is on. Press and hold the reset button. 

Hold the reset button down for approximately 8 seconds 

until you see “re”, continue holding until you see the 

number 12 and hear it beep. At this point release the 

button. The 1 year lamp timer has just been reset. (Fig 4)

ALARM CONDITIONS
U.V. lamp Detector and Timer circuit board Lamp

Operation and Alarm features:
• MONTH LED (Green)- Number of months remaining

GDS ©2019 • www.aquat.com

Содержание GDS-25

Страница 1: ...Installation Operation and Maintenance Manual CAUTION Read and Follow all safety rules and operating instructions before first use of product MODEL GDS 25 Ultraviolet Disinfection Systems Dealer Info...

Страница 2: ...GDS Series 2016 2...

Страница 3: ...tion Diagram 7 Electronic Controls Startup Procedures 8 Sample Screen Shots 9 Sanitation Procedure 10 11 Maintenance 12 Unit Parts Breakdown 13 Circuit Board Layout 14 Wiring Diagram 15 Troubleshootin...

Страница 4: ...y cause an unsafe condition 7 Intended for indoor use Do not install this disinfection system where it will be exposed to the weather Do not store this disinfection system where it will be exposed to...

Страница 5: ...rs cannot be maintained Flow rate must not exceed rated capacity of the unit The GDS series has a unique design with an ultraviolet germicidal lamp housed within a single quartz sleeve surrounded by a...

Страница 6: ...a vertical position in an enclosed area with good ventilation Allow clearance of at least the unit s length at one end for quartz sleeve and lamp replacement Four 4 anchor bolt holes are provided for...

Страница 7: ...GDS Series 2016 7 Installation Diagram GDS 2019 www aquat com...

Страница 8: ...ronic circuit board provides the latest in U V lamp monitoring technology U V LAMP CONTROL START UP PROCEDURE 1 Make sure the U V lamp is inserted per instructions into the quartz sleeve and U V chamb...

Страница 9: ...GDS Series 2016 9 Sample Screen Shots Fig 1 Fig 2 Fig 3 Fig 4 GDS 2019 www aquat com...

Страница 10: ...Water in the well and storage tank should be treated with a strong chlorine solution to destroy disease organisms All pipelines and fixtures in the distribution system should be rinsed and flushed wit...

Страница 11: ...isinfect the water if necessary Plumbing Line Sanitation Only When installing an ultraviolet disinfection system a prefilter with sump may serve as a source to sanitize the water lines only For whole...

Страница 12: ...the quartz sleeve through the stainless steel threaded nipples with 0 5 sticking out on each end Use a small amount of plumber s grease and install the o ring around the quartz sleeve Avoid riding the...

Страница 13: ...GDS Series 2016 13 Parts Breakdown GDS 25 GDS 2019 www aquat com...

Страница 14: ...GDS Series 2016 14 Circuit Board Layout GDS 2019 www aquat com...

Страница 15: ...GDS Series 2016 15 Wiring Diagram GDS 2019 www aquat com...

Страница 16: ...nstall a voltage regulator Check replace Replace Lamp Check output voltage Replace ballast Trace out and repair Leak at quartz nipple Defective or cracked o ring Replace o ring O Ring not seated prope...

Страница 17: ...additional three minutes 3 Open the sterile bottle or sterile container being used Holding the cap in a down position the operator should then hold his breath while taking the sample so as to avoid o...

Страница 18: ...GDS Series 2016 18 GDS 25 Specifications GDS 2019 www aquat com...

Страница 19: ...GDS Series 2016 19 Notes GDS 2019 www aquat com...

Страница 20: ...GDS Series 2016 20 Warranty GDS 2019 www aquat com...

Отзывы: