Atos ACHP-2 Скачать руководство пользователя страница 7

6.1

Unpacking and Installation

Please dispose of all packaging materials and residues 
after unpacking;
Check the equipment. If it is damaged, please keep 
wrappers and receipts which must be signed by the carrier 
representative (Driver), and contact the carriers to 
pursue a claim within 15 days after receiving;
Be sure to install supporting legs before using, and do 
not tear up any label or logo before normal using;
Please read these instructions carefully before 
installation and operation. Please contact your local 
agent if you have any questions;
The equipment shall be installed on a level, solid, non-
skid and incombustible surface, and placed in a well-
lighted work area with waterproof, and away from children 
and customers;
The installation position is a well-ventilated place in 
accordance with the local regulations;

The charbroiled must be installed under the matched cooking 
fume exhauster according to the local regulations;

Important: Installation and ventilation laws, and codes 
are very different, you should state and comply with all 
codes of the National Fire Protection Association Inc 
when it comes to requirements for installation of 
equipment;

Screw 4 adjustable stainless steel legs in the tapping 
hole with four corners of the charbroiled bottom, ensure 
sufficient space for ventilation;
Adjustable stainless steel legs to make the equipment 
level, and get the same level with other series of the 
same stove; Please lift the equipment rather than drag if 
you need to move it;
Supplied gas pressure regulator is factory set at 4”
Natural Gas W.C, and 10”L.P. Gas W.C; 
The equipment can only be placed on the incombustible 
counter top, and keep a distance of at least 6 
inches(152mm) to equipment’s both sides and back, and 
keep a distance of at least 4 inches(102mm) to the 
bottom;
Do not put anything around the equipment, and on the 
counter top and bottom, in order to avoid influencing 
combustion and air circulation;
Leave enough distance in front of the equipment to take 
apart the control panel. All major parts, in addition to 
the burner remove from the front intake-tube;
It may be necessary to adjust the balance of air input by 
authorized and licensed technicians;
Thread glue must be resistant to the action of liquefied 
petroleum gases.

 

7

Содержание ACHP-2

Страница 1: ...is product correctly to make the product perform ideally and to avoid hazards Models ACHP 2 ACHP 4 ACHP 6 Dear customers and users Thank you for purchasing our products In order to be able to better u...

Страница 2: ...tinguish any open flame If odor continues keep away from the appliance and immediately call your gas supplier or your fire department Gas Countertop Hot Plates Cooktop s The Installation Operation and...

Страница 3: ...h appropriate instructions and sufficient safety 2 Brief Instructio n The product is a series of gas hot plates in our company production which is novel designed reasonable structured convenient opera...

Страница 4: ...manufacturers Accidents caused by force majeure Not strictly comply with related guide of this instruction by any reason 4 Parameter Specification s 4 1 Outline Dimensions in ACHP 2 ACHP 4 4...

Страница 5: ...6 4 2 Information of Gas Supply and Burner The minimum supplied gas pressure regulator is factory set at 4 Natural Gas W C and 10 L P Gas W C The external thread of product s intake tube is 3 4 inche...

Страница 6: ...d in accordance with the local code If no similar standard you should conform to the National Fuel Gas Code ANSI Z223 1 NFPA 54 the National Gas Installation Code CSA B149 1 or the L P Gas Installatio...

Страница 7: ...d comply with all codes of the National Fire Protection Association Inc when it comes to requirements for installation of equipment Screw 4 adjustable stainless steel legs in the tapping hole with fou...

Страница 8: ...needle type pressure joint screw arbor Important must screw joint screw arbor to prevent gas escape 6 2 Debuggin g It s very important to debug the new stove Through the comprehensive system test of e...

Страница 9: ...repair it Do not take apart any spare parts without authorization Never change any other parts without authorization to this equipment otherwise may cause hazards and the manufacturer has the right n...

Страница 10: ...ghting the pilot light then the main fire burner is lighted by the pilot light The power of burner increases as revolving angel increases When knob reaches to burner is in the maximum power Fig 4 Fig...

Страница 11: ...LE 1 then screw it Reinstall burner the pilot light head cooking grates and control panel in proper order Caution Each main fire orifice of the burner has been installed before delivery normal use wit...

Страница 12: ...in a well ventilated area Comprehensively check the equipment at least once every year by authorized and licensed technicians The product is made of 90 metals and can not be discarded everywhere Deal...

Страница 13: ...he main fire s distance is too far 4 Adjust the distance of them 5 Flame is too low 5 Adjust the height of the pilot light Close gas and heard a sound of fire 1 Insufficient gas pressure in pipe 1 Con...

Страница 14: ...intake ensure gas mark Fig 9 on the plastic core whether match with connected gas source if not then pull out the plastic core and change another head insert it again The same as exchanging gas source...

Страница 15: ...oducts have the advantages of good durability and low maintenance charge But to update some components and necessary maintenance can prolong life length of the products Contact the dealer for assistan...

Отзывы: