10
First steps
Aton CLT615ISDN / Swisscom EN / A31008-N3101-F151-2-2X43 / starting.fm / 18.02.11
V
e
rsion 4, 16.0
9
.2005
Connecting the base
The following diagram is an overview of all connections for your base.
The individual connections are described in detail below.
Follow the steps in the order given below:
1 Connect the receiver to the base.
2 Connect the base to the telephone network.
3 Connect the base to the mains power supply.
4 Connect the base to the router for accessing the Internet (connection via router
and modem or via router with integrated modem) and for configuring the base
via the Web configurator.
5 Connect a wire-bound headset to the base.
6 Connect the base to a fax device.
1
2
3
4
6
5