- 60 -
PREVENTIVE MAINTENANCE SCHEDULE
The schedule contains a summary of the maintenance
instructions. Read the respective section before taking
maintenance measures.
When servicing, replace all disengaged packings, e.g.
gaskets, O-rings, washers.
For engine maintenance refer to Engine Operation
Manual.
The maintenance schedule has to be seen as a
guideline for units operating in a dusty environment
typical to compressor applications. Maintenance
schedule can be adapted depending on application,
environment and quality of maintenance.
Unauthorised modifications can lead to
risk for injury or machine damage.
Always keep the machine tidy in order to
prevent fire hazard.
Poor maintenance can void any
warranty claims.
MAINTENANCE SCHEDULE COMPRESSOR
To determine the maintenance intervals, use service hours, or calendar time, whichever occurs first.
Service hours
Daily
50 hrs
after initial
start-up
Every
250 hrs
Every
500 hrs
Every
750 hrs
Every
1000 hrs
Every
2000 hrs
Yearly
Service parts
1092 0613 34
PAK
3002 6071 00
PAK
For the most important subassemblies, Atlas Copco has developed service kits that combine all wear parts. These service kits offer you the benefits of genuine parts,
save on administration costs and are offered at reduced price, compared to the loose components. Refer to the parts list for more information on the contents of the
service kits.
Drain water from fuel filter
x
Drain/Clean fuel tank water and sediments (1)
x
x
x
Drain condensate and water from frame in case of spillage free
frame (10)
x
(to be continued on page 61)
Содержание XRHS 1150 CD4 C3 WUX
Страница 2: ......
Страница 16: ... 16 Main parts ...
Страница 18: ... 18 REGULATING SYSTEM ...
Страница 21: ... 21 ELECTRIC SYSTEM 9822 0963 40 C13 HP ...
Страница 104: ... 104 Maintenance Log Compressor Customer Serial number Service hours Maintenance action Date By initials ...
Страница 105: ......
Страница 106: ...www atlascopco com ...