Installation and Operation Manual
Document #9620-20-b-mc-16 base tool changer-07
Pinnacle Park
•
1031 Goodworth Drive
•
Apex, NC 27539
•
Tel: 919.772.0115
•
Fax: 919.772.8259
•
www.ati-ia.com
•
Email: [email protected]
B - 13
3.
To install a new seal, stretch the new seal over the shoulder of the pin block.
4.
Push the seal’s hub down against the pin block using finger tip.
Figure 4.5 —V-Ring seal Replacement
5. Troubleshooting
Check these conditions for all symptoms prior to troubleshooting:
•
Proper pneumatic and electrical connections have been made to the Manual Coupler.
•
Mounting screws are properly installed.
•
Locking Cam Screw is fully tightened (to approximately 25 in-lbs).
Symptom
Cause
Resolution
Unit will not lock or
unlock
The locking mechanism
cam is jammed.
Clean and lubricate as needed to restore smooth
operation (see
Section 4—Maintenance
The cam screw is not
moving.
Check for debris in the handle area of the locking
mechanism, and clean if necessary.
The Master and Tool are
not touching prior to lock.
Check that the Tool is properly seated in the
Tool Stand.
Verify that there is no debris between the Master
and Tool prior to locking.