![Athena 850-BL EVO Скачать руководство пользователя страница 57](http://html1.mh-extra.com/html/athena/850-bl-evo/850-bl-evo_translation-of-original-instructions_2998368057.webp)
PAGE
57
ALMAC s.r.l.
3.2.3
Ground controls
The platform features a control console located on the chassis at the back of the
machine. These controls are useful for the operator on the ground for platform
maintenance or for emergency situations (red mushroom button).
The ground controls are protected against unauthorized use by a key that is used
to activate the 3 way switch.
Warning: The key must always be available to the recovery operator or the
person in charge of the operations from the ground.
The Involuntary activation of the ground controls is inhibited thanks to the
automatic selection performed by the key: by turning it to "work platform
controls" (RIGHT), it automatically disables the ground control console while the
"ground controls" position (LEFT) automatically disables the control console.
Содержание 850-BL EVO
Страница 7: ...PAGE 7 ALMAC s r l MAXIMUM WORKING HEIGHT TRAVELLING NOT PERMITTED H1 H2 G3 H3 H4 G4 G1 L1 G2 ...
Страница 10: ...PAGE 10 ALMAC s r l ...
Страница 23: ...PAGE 23 ALMAC s r l ...
Страница 49: ...PAGE 49 ALMAC s r l 35 Combustion engine 36 Fuel tank 37 Bi levelling chassis 37 38 ...
Страница 78: ...PAGE 78 ALMAC s r l ...
Страница 80: ...PAGE 80 ALMAC s r l ...
Страница 122: ...PAGE 122 ALMAC s r l In this configuration the oil level must be as shown in the figure below A 60mm ...
Страница 144: ...PAGE 144 ALMAC s r l ...
Страница 145: ...PAGE 145 ALMAC s r l ...
Страница 146: ...PAGE 146 ALMAC s r l ...
Страница 147: ...PAGE 147 ALMAC s r l ...
Страница 148: ...PAGE 148 ALMAC s r l ...
Страница 149: ...PAGE 149 ALMAC s r l ...
Страница 150: ...PAGE 150 ALMAC s r l ...
Страница 151: ...PAGE 151 ALMAC s r l ...
Страница 152: ...PAGE 152 ALMAC s r l ...
Страница 159: ...PAGE 159 ALMAC s r l ...
Страница 162: ...PAGE 162 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity ...
Страница 164: ...PAGE 164 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature ...
Страница 178: ...PAGE 178 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment ...