background image

8/12 

 

Operati

ng instructions

 

3.1  Personnel 

The use of the equipment is to be controlled and accepted by the operator. The personnel using 
the unit have to be authorized by the operator or his representative. In case of further training of 
using the equipment please contact the local supplier of the equipment. 

3.2  Storage 

SLAM Star units should be stored in a dry place within normal operating temperatures ie. 
-20 °C

+40 °C. The units should not be stored in direct sunlight. 

3.3  Before first use 

Read  this  manual  carefully  before  taking  the  product  in  to  use.  Archive  the  documents  included 
with the unit for further reference (manual, test report and declaration of conformity). 

3.4  Visual inspection 

As  for  all  equipment  to  be  used  inside  explosion  hazardous  area  it  is  recommended  that  before 
taking the unit into Ex –area, a visual re-inspection on the unit was taken and an analysis made 
that the unit is not damaged (e.g. any part or wires are loose damaged or disconnected). 

In case faults or defects on the unit are noticed, it is prohibited to take the unit into Ex –area until 
corrective actions have been made.

 

3.5  Special attention on 2-pole use (24 V or 42 V) 

Certain  SLAM  Star  units  are  designed  to  be  used  together  with  step-down  transformers.  Using 
SLAM Star unit with transformers of 2-pole socket outlets (without grounding / bonding) imposes 
certain extra requirements for the unit itself.

 

Please inform us about your requirement for 2-pole use when placing the order. Products originally 
manufactured  for  3-pole  use  can  not  be  modified  later  for  2-pole  use  by  the  operator.  Such 
modifications  are  only  allowed  to  be  carried  out  by  the  manufacturer  or  under  supervision  of  the 
manufacturer. 

Note! Lack of equipotential bonding may cause danger in Ex –area, therefore please pay special 
attention to all installations involving metallic parts. Static charging is especially noted on standards 
referring to installations in explosion hazardous areas (e.g. EN/IEC 60079-14). 

3.6  Connection to the supply 

It  is  recommended  that  the  unit  is  first  connected  to  the  mains  /  transformer  before  entering  the 
explosion hazardous area. Potential equalization should be arranged by the operator prior entering 
explosion hazardous area. 

SLAM  Star  units  with  2-pole  supply  (without  bonding  connection)  can  be  taken  to  explosion 
hazardous area without connecting it to the supply first. 

3.6.1  Requirements for supply (electricity) 

Supply voltage

: Variation may be maximum ±10% from the value stated in the unit type label. 

Current

: Maximum current of the system is 16 A. 

Содержание SLAM Star

Страница 1: ...Instructions for Safe Use Star Certification N o VTT 15 ATEX 077X and IECEx by VTT Thank you for choosing SLAM Star portable work light for your job site Purpose of this manual is to provide you all...

Страница 2: ...e with Equipment group IIA IIB or IIC 6 2 5 Temperature class of the equipment 6 2 6 Environmental criteria 7 3 Operating instructions 8 3 1 Personnel 8 3 2 Storage 8 3 3 Before first use 8 3 4 Visual...

Страница 3: ...ndependent from each others Under failure of one control gear the others still continue operating Low voltage protection smart feature brings reliability and convenience for use especially when operat...

Страница 4: ...losion hazardous areas II Certified for use in areas excluding mines 2 Equipment category suitable for Zone 1 and Zone 2 G Certification taking account explosion hazardous GASES Explanation of marking...

Страница 5: ...The test report typically specifies the following tests PE resistance test The purpose of this test is to measure persistence of earth conductor Vital test for electrical safety as well as explosion s...

Страница 6: ...plosion hazardous areas there are three equipment categories Category 1 product is suitable for use in Zones 0 1 and 2 20 21 and 22 Category 2 product is suitable for use in Zones 1 and 2 21 and 22 Ca...

Страница 7: ...on is valid for temperatures between 20 C 40 C If the equipment is used in other temperatures the safety cannot be guaranteed Selection and use of equipment is always under the responsibility of the o...

Страница 8: ...LAM Star units are designed to be used together with step down transformers Using SLAM Star unit with transformers of 2 pole socket outlets without grounding bonding imposes certain extra requirements...

Страница 9: ...tar units may be equipped with Ex certified socket in the factory Sockets are considered optional so they are added to the unit upon customer s special request In built sockets are recommended when th...

Страница 10: ...luminaries to a longer chain than 66 m measured from the protective fuse when the electrical supply is protected with C curve fuse Please refer to local applicable laws and requirements for electrical...

Страница 11: ...greater than 100 cm2 the part has to be changed The surface resistance of the transparent parts has to be between 1 M 1 G Please contact Atexor in case you need a simple measuring device which is nee...

Страница 12: ...e day Please study at least the following standards EN IEC 60079 14 Electrical installations in hazardous areas EN IEC 60079 10 Classification of hazardous areas EN IEC 60079 17 Inspection and mainten...

Отзывы: