background image

2/12 

 

Contents

 

1

 

Introduction ................................................................................................................................................ 3

 

1.1

 

Technical data ................................................................................................................................... 3

 

1.2

 

Unit construction ............................................................................................................................... 3

 

1.3

 

Certification of equipment ................................................................................................................. 4

 

1.4

 

Quality guaranteed ............................................................................................................................ 5

 

1.4.1

 

General .......................................................................................................................................... 5

 

1.4.2

 

Individual test report ...................................................................................................................... 5

 

1.4.3

 

Warranty ........................................................................................................................................ 5

 

2

 

Prior to use ................................................................................................................................................. 6

 

2.1

 

Selection of right equipment .............................................................................................................. 6

 

2.2

 

Intended purpose of equipment ........................................................................................................ 6

 

2.3

 

Application of use (Zone XX) in accordance with equipment category ............................................. 6

 

2.4

 

Explosion group (IIA, IIB or IIC) in accordance with Equipment group (IIA, IIB or IIC) ..................... 6

 

2.5

 

Temperature class of the equipment ................................................................................................. 6

 

2.6

 

Environmental criteria ....................................................................................................................... 7

 

3

 

Operating instructions ................................................................................................................................ 8

 

3.1

 

Personnel .......................................................................................................................................... 8

 

3.2

 

Storage .............................................................................................................................................. 8

 

3.3

 

Before first use .................................................................................................................................. 8

 

3.4

 

Visual inspection ............................................................................................................................... 8

 

3.5

 

Special attention on 2-pole use (24 V or 42 V) ................................................................................. 8

 

3.6

 

Connection to the supply ................................................................................................................... 8

 

3.6.1

 

Requirements for supply (electricity) ............................................................................................. 8

 

3.7

 

Adding accessories to SLAM Star ..................................................................................................... 9

 

3.8

 

Linking luminaires in series ............................................................................................................... 9

 

4

 

Inspection and maintenance .................................................................................................................... 11

 

4.1

 

After Use ......................................................................................................................................... 11

 

4.2

 

Repair .............................................................................................................................................. 11

 

4.3

 

Testing ............................................................................................................................................ 11

 

4.4

 

Repair report ................................................................................................................................... 11

 

4.5

 

More information about the use of Electrical Apparatus for Explosive Gas Atmospheres .............. 12

 

 

Содержание SLAM Star

Страница 1: ...Instructions for Safe Use Star Certification N o VTT 15 ATEX 077X and IECEx by VTT Thank you for choosing SLAM Star portable work light for your job site Purpose of this manual is to provide you all...

Страница 2: ...e with Equipment group IIA IIB or IIC 6 2 5 Temperature class of the equipment 6 2 6 Environmental criteria 7 3 Operating instructions 8 3 1 Personnel 8 3 2 Storage 8 3 3 Before first use 8 3 4 Visual...

Страница 3: ...ndependent from each others Under failure of one control gear the others still continue operating Low voltage protection smart feature brings reliability and convenience for use especially when operat...

Страница 4: ...losion hazardous areas II Certified for use in areas excluding mines 2 Equipment category suitable for Zone 1 and Zone 2 G Certification taking account explosion hazardous GASES Explanation of marking...

Страница 5: ...The test report typically specifies the following tests PE resistance test The purpose of this test is to measure persistence of earth conductor Vital test for electrical safety as well as explosion s...

Страница 6: ...plosion hazardous areas there are three equipment categories Category 1 product is suitable for use in Zones 0 1 and 2 20 21 and 22 Category 2 product is suitable for use in Zones 1 and 2 21 and 22 Ca...

Страница 7: ...on is valid for temperatures between 20 C 40 C If the equipment is used in other temperatures the safety cannot be guaranteed Selection and use of equipment is always under the responsibility of the o...

Страница 8: ...LAM Star units are designed to be used together with step down transformers Using SLAM Star unit with transformers of 2 pole socket outlets without grounding bonding imposes certain extra requirements...

Страница 9: ...tar units may be equipped with Ex certified socket in the factory Sockets are considered optional so they are added to the unit upon customer s special request In built sockets are recommended when th...

Страница 10: ...luminaries to a longer chain than 66 m measured from the protective fuse when the electrical supply is protected with C curve fuse Please refer to local applicable laws and requirements for electrical...

Страница 11: ...greater than 100 cm2 the part has to be changed The surface resistance of the transparent parts has to be between 1 M 1 G Please contact Atexor in case you need a simple measuring device which is nee...

Страница 12: ...e day Please study at least the following standards EN IEC 60079 14 Electrical installations in hazardous areas EN IEC 60079 10 Classification of hazardous areas EN IEC 60079 17 Inspection and mainten...

Отзывы: