4.1  After Use 

Take the following steps after the SLAM Star unit has been taken out from Ex-area 

1)  Clean the unit with a damp cloth (do not use detergents or solvents) 
2)  Change the anti-static film of the light unit tubes if only little light comes through it or it is 

damaged 

3)  Have a visual check on the unit (condition of cable, light unit, enclosure, tightness of parts) 
4)  Let the unit dry in open air 
5)  Store the unit (see 3.2 Storage) 

4.2  Repair 

The following procedure should be taken in case the SLAM Star unit needs to be repaired 

1)  Repairs may be carried out only outside Ex –area 
2)  Person  responsible  for  maintenance  should  have  been  trained  the  basics  of  explosion-

protection as well electricity 

3)  Only  original  spare  parts  from  Atexor  should  be  used.  Please  note  that  there  are  no 

components in this unit which can be repaired by using glue, silicone or any other similar 
method. 

4)  The  dissipation  feature  (antistatic)  on  transparent  parts  of  SLAM  Star  may  be  damaged 

because  of  external  affects  like  solvents  or  chemicals  or  mechanical  stress.  In  case  the 
surface  of  the  PC-tube  is  damaged  in  one  area  greater  than  100  cm

2

  the  part  has  to  be 

changed. The surface resistance of the transparent parts has to be between 1 M

Ω…

1 G

Ω

Please  contact  Atexor  in  case  you  need  a  simple  measuring  device,  which  is  needed  for 
measuring surface resistance of the PC-tubes. 

5)  Maintenance instructions with exploded-view diagram and spare parts list are available at 

your  local  distributor  and  the  manufacturer.  Please,  when  requesting  maintenance 
instructions  with  exploded-view  diagrams,  include  the  model  and  serial  number  of  the 
product. 

The device has electronics inside, please use required actions when disposing of 
the device or its components. 

4.3  Testing 

Tests  are  to  be  done  according  to  EN/IEC  60079-19  before  returning  the  repaired  unit  back  to 
operation. The following tests shall be done in addition to the tests specified in EN/IEC 60079-19. 

  PE –resistance test 

  High-voltage  test  (500  VDC  between  Phase  &  Neutral  against  P/E  conductor;  N/A  for  2-

pole units) 

  Operational test 

  Test of expected use (vibrations, shaking) 

Proper testing ensures safe operation of repaired equipment. 

4.4  Repair report 

The operator is responsible for keeping up to date record of the condition of his equipment (EN/IEC 
60079-14). Ensuring the availability of this important information each repair procedure should be 
written down in repair report according to EN/IEC 60079-19. 

Содержание SLAM Star

Страница 1: ...Instructions for Safe Use Star Certification N o VTT 15 ATEX 077X and IECEx by VTT Thank you for choosing SLAM Star portable work light for your job site Purpose of this manual is to provide you all...

Страница 2: ...e with Equipment group IIA IIB or IIC 6 2 5 Temperature class of the equipment 6 2 6 Environmental criteria 7 3 Operating instructions 8 3 1 Personnel 8 3 2 Storage 8 3 3 Before first use 8 3 4 Visual...

Страница 3: ...ndependent from each others Under failure of one control gear the others still continue operating Low voltage protection smart feature brings reliability and convenience for use especially when operat...

Страница 4: ...losion hazardous areas II Certified for use in areas excluding mines 2 Equipment category suitable for Zone 1 and Zone 2 G Certification taking account explosion hazardous GASES Explanation of marking...

Страница 5: ...The test report typically specifies the following tests PE resistance test The purpose of this test is to measure persistence of earth conductor Vital test for electrical safety as well as explosion s...

Страница 6: ...plosion hazardous areas there are three equipment categories Category 1 product is suitable for use in Zones 0 1 and 2 20 21 and 22 Category 2 product is suitable for use in Zones 1 and 2 21 and 22 Ca...

Страница 7: ...on is valid for temperatures between 20 C 40 C If the equipment is used in other temperatures the safety cannot be guaranteed Selection and use of equipment is always under the responsibility of the o...

Страница 8: ...LAM Star units are designed to be used together with step down transformers Using SLAM Star unit with transformers of 2 pole socket outlets without grounding bonding imposes certain extra requirements...

Страница 9: ...tar units may be equipped with Ex certified socket in the factory Sockets are considered optional so they are added to the unit upon customer s special request In built sockets are recommended when th...

Страница 10: ...luminaries to a longer chain than 66 m measured from the protective fuse when the electrical supply is protected with C curve fuse Please refer to local applicable laws and requirements for electrical...

Страница 11: ...greater than 100 cm2 the part has to be changed The surface resistance of the transparent parts has to be between 1 M 1 G Please contact Atexor in case you need a simple measuring device which is nee...

Страница 12: ...e day Please study at least the following standards EN IEC 60079 14 Electrical installations in hazardous areas EN IEC 60079 10 Classification of hazardous areas EN IEC 60079 17 Inspection and mainten...

Отзывы: