background image

12/16 

 

 

 

4)  The in-built socket is only for chaining Slam® Hornet Emergency -units. 
5)  Fix them with accessories you have selected  
6)  Take the chain into Ex 

–area 

Amount of lights which may be connected with each other depends on the supply voltage. Here you may see 
general guide-lines for linking with 5 m 3x1.5mm

2

 (or 3x2.5mm

2

 ) cable each: 

 
 

Supply 

voltage 

Recommended 

max. load 

Type of luminary 

Number of 

luminaries in series 

230 V 

2000 W 

CSHEM1840 (58 

W) 

27 

110 V 

1000 W 

CSHEM1840 (58 

W) 

13 

42 V 

500 W 

CSHEM1840 (58 

W) 

24 V 

290 W 

CSHEM1840 (58 

W) 

 
 
The Slam® Hornet Emergency ballast protects itself against excessive voltage drops (numerous linking) by 
switching itself off. If too many units are connected to the chain, some units of the chain will switch off. You may 
start up by unplugging the last units on the line. 
 
Voltage peaks are more harmful and may damage the ballast permanently when subjected to excessive peaks 
continuously. 
 
If fluorescent tubes are flickering when the units are chained up, it may be due to excessive linking. This may 
shorten notably the lifetime of fluorescent tube. Unplug the last unit on the line to ensure proper function of the 
unit. 
 

3.8 Special operating features of Slam® Hornet Emergency 

Connect luminaire to mains/transformer. Push power button on the end part to turn lamps on 
and off. Power button has green integrated standby/power LED to ease finding button at dark 
enviroments and indicating lamp is powered. All Slam® Hornet Emergency -units are 
equipped with Li-Ion battery backup to allowing 18W fluorecent lamp illuminate during power 
failures. By using power button the operation of battery-back up can be controlled (ON 
/OFF).Battery is charging whenever device is connected to mains/transformer. Optional Red 
charging LED (between fluorescent lamps) illuminates during charge. Battery is fully charged 
when red charging LED turns off. 
 
 

Содержание Slam Hornet Emergency 18+40W

Страница 1: ...ication N o VTT 08 ATEX 030X Thank you for choosing Slam Hornet Emergency portable work light for your job site Purpose of this manual is to provide you all the necessary safety and product informatio...

Страница 2: ...2 16...

Страница 3: ...p IIA IIB or IIC in accordance with Equipment group IIA IIB or IIC 9 2 1 4 Temperature class of the equipment 9 2 1 5 Environmental criteria 9 3 Operating instructions 10 3 1 Personnel 10 3 2 Before f...

Страница 4: ...16 4 3 Testing 14 4 4 Repair report 14 4 5 Periodical testing of CentaurSlam Hornet Emergency 14 4 6 More information about the use of Electrical Apparatus for Explosive Gas Atmospheres 15 Helpdesk 1...

Страница 5: ...tificate for special conditions of safe use of the equipment Special conditions of safe use specifies Ambient temperature can be 20 C 40 C without Ex socket With Ex socket as specified for the used so...

Страница 6: ...of 20 C 40 C Gb Explosion Protection Level EPL marking for HIGH level of protection Equipment for explosive GAS atmospheres which is not a source of ignition in normal operation or during expected mal...

Страница 7: ...g appropriate help for the user to complete his job Cable Standard cable of the Slam Hornet series is H07BQ F This cable has polyurethane PUR outer sleeve PUR withstands well chemicals as well mechani...

Страница 8: ...can not be identified visually Testing voltage applied is 2130VDC Maximum leakage current is 5mA Test of expected use of equipment The luminary is subjected to shaking and vibration to see that all th...

Страница 9: ...o three different groups IIA IIB and IIC Further information about the substances can be found from EN 60079 10 Slam units mentioned in this instruction are Equipment group IIC 2 1 4 Temperature class...

Страница 10: ...ts or defects on the unit are noticed it is prohibited to take such a unit into Ex area until the corrective actions have been made 3 4 Special attention on 2 pole use 24 V or 42 V Certain Slam Hornet...

Страница 11: ...ts 1 The user is fully responsible for the use of the equipment including service and maintenance 2 In case of adding accessories the following is mandatory a The construction of the certified unit sh...

Страница 12: ...rmful and may damage the ballast permanently when subjected to excessive peaks continuously If fluorescent tubes are flickering when the units are chained up it may be due to excessive linking This ma...

Страница 13: ...Inspection Maintenance 4 1 After Use Take the following steps after the Slam Hornet Emergency unit has been taken out from Ex area 1 Clean the unit with a damp cloth do not use detergents or solvents...

Страница 14: ...returning the repaired unit back to operation Below mentioned tests shall be done in addition to the tests specified in EN 60079 19 PE resistance test High voltage test 500 VDC between Phase Neutral a...

Страница 15: ...tandards of the day Please study at least the following standards EN 60079 14 Electrical installations in hazardous areas EN 60079 10 Classification of hazardous areas EN 60079 17 Inspection and maint...

Страница 16: ...16 Helpdesk Under any doubt or question please contact your local distributor or the manufacturer Contact details Phone 358 20 734 3250 Fax 358 20 734 3299 Email info atexor com Web http www atexor c...

Отзывы: