background image

7/16 

 

 

 

1.4.2 Individual testing reports 

 
Each  Slam®unit  has  its  own  individual  serial  number  and  is  provided  with  an  original, 
individual testing report when leaving the factory.  The year of manufacture is specified on the 
type  label  of  the  equipment.  Following  tests  have  been  done  for  Slam®Hornet

–units 

according  to  standards  relating  to  portable  luminaries  for  explosion  hazardous  area.  The 
Declaration  of  Conformity  is  specifying  the  relevant  standards.  The  testing  report  which  is 
included  in  the  delivery  specifies  the  results  of  the  factory  tests  for  that  particular  unit.  The 
testing report typically specifies the following tests: 
 
 

PE 

–resistance test

 

The purpose of this test is to measure persistence of earth conductor.  
Vital  test  for  electrical  safety  as  well  as  explosion  safety  because  of  e.g  static  electricity 
control. 
The test current is 10 A (current) and the overall resistance should not exceed 0,5 ohm. 
 

High voltage test (electrical strength) 

The  purpose  of  this  test  is  to  measure  leakage  current  trough  insulation.  Vital  test  for 
revealing broken components or similar failures which can not be identified visually. 
Testing voltage applied is  2130VDC. Maximum leakage current is 5mA.

 

 

 

Test of expected use of equipment 

The  luminary  is  subjected  to  shaking  and  vibration 

–  to  see  that  all  the  internal  wires  are 

properly attached and components are not loose. 
 

Operational test of luminaire and accessories 

The  unit  is  plugged-in  and  checked  that  it  is  working  properly  after  all  accomplished  tests 
above. 
 
 

Visual inspection 

A  final  check  to  see  everything  is  fine  (screws  attached  properly,  wires  connected  and 
required markings attached). 
 
 
 

2.

 

Prior to use 

 

2.1 Selection of right equipment 

 
You  need  to  be  sure  that  the  equipment  you  intend  to  take  into  explosion-hazardous  area 
matches up with the zone classification and other safety requirements related. The operator is 
solely responsible for the correct selection and use of the equipment at  his site. At least the 
following points should be notified prior to use:  

Содержание Slam Hornet 1 LED A

Страница 1: ...08 ATEX 066 or IECEx VTT 12 0009 Thank you for choosing Slam Hornet portable work light for your job site Purpose of this manual is to provide you all the necessary safety and product information to...

Страница 2: ...IA IIB or IIC in accordance with Equipment group IIA IIB or IIC 8 2 1 4 Temperature class of the equipment 9 2 1 5 Environmental criteria 9 3 Operating instructions 10 3 1 Personnel 10 3 2 Visual Insp...

Страница 3: ...et 2 LED Slam Hornet Linear 2x18W Slam Hornet Linear 2x36W Slam Hornet Linear 2 LED Dimensions mm Product model L Slam Hornet 1x18W 335 115 Slam Hornet 1x36W A Slam Hornet 1 LED A 540 115 Slam Hornet...

Страница 4: ...sion hazardous GASES D Certification taking account explosion hazardous DUSTS Explanation of marking for explosion hazardous area due to Gases e g Ex emb IIC T3 Gb Ex Certified for use in explosion ha...

Страница 5: ...ation or during expected malfunctions 1 3 Standard unit construction The following list familiarizes you with some common unit features important to recognize End parts Flexible plastic made end parts...

Страница 6: ...nts of own Socket Optional in built sockets receptacles for linking the Slam Hornet units in series apart from CSH118 Other common accessories Antistatic protective film for PC tube against chemical s...

Страница 7: ...5 ohm High voltage test electrical strength The purpose of this test is to measure leakage current trough insulation Vital test for revealing broken components or similar failures which can not be ide...

Страница 8: ...t category For explosion hazardous areas there are three equipment categories Category 1 product is suitable for use in Zones 0 1 and 2 20 21 and 22 Category 2 product is suitable for use in Zones 1 a...

Страница 9: ...ntioned in this instruction are Temperature Class T4 GASES Slam units with fluorescent tube and LED modules mentioned in this instruction are having maximum surface temperature of 90 C DUSTS 2 1 5 Env...

Страница 10: ...be used together with step down transformers Using Slam Hornet unit with transformers of 2 pole socket outlets without earthing bonding imposes certain extra requirements for the unit itself All the e...

Страница 11: ...king capacity of at least 1500 A Earth Leakage Circuit Breaker ELCB It is recommended to use a supply with 30 mA ELCB Please observe the type label for further data Luminaires for 110 VAC or 230 V sup...

Страница 12: ...is only for chaining Slam Hornet units 5 Fix them with accessories you have selected 6 Take the chain into Ex area Amount of lights which may be connected with each other depends on the supply voltage...

Страница 13: ...net control gear protects itself against excessive voltage drops numerous linking by switching itself off If too many units are connected to the chain some units of the chain will switch off You may s...

Страница 14: ...needed for measuring surface resistance of the PC tube 5 Maintenance instructions with exploded view diagram and spare parts list are available at your local distributor and the manufacturer Please wh...

Страница 15: ...Gas Atmospheres Please observe the requirements of the valid standards of the day Please study at least the following standards EN IEC 60079 14 Electrical installations in hazardous areas EN IEC 60079...

Страница 16: ...16 Helpdesk Under any doubt or question please contact your local distributor or the manufacturer Contact details Phone 358 20 734 3250 Fax 358 20 734 3299 Email info atexor com Web http www atexor c...

Отзывы: