ATESS EVA-07D-PE Скачать руководство пользователя страница 1

single-phase AC charger Quick installation guide

1st Floor of Building 3 at Sector B and 3rd Floor of Building 9, Henglong
Industrial Park, Shuitian, Baoan District, Shenzhen
T +86 755 2998 8492
F +86 755 2998 5623

 www.atesspower.com

Shenzhen ATESS Power Technology Co.,Ltd

ATESS EVA-07D-SE/PE

Содержание EVA-07D-PE

Страница 1: ...guide 1st Floor of Building 3 at Sector B and 3rd Floor of Building 9 Henglong Industrial Park Shuitian Baoan District Shenzhen T 86 755 2998 8492 F 86 755 2998 5623 www atesspower com Shenzhen ATESS...

Страница 2: ...ment via Mobile phone APP Diversified communication options including wired Ethernet WIFI 4G is available for back office server connection EVA 07D SE has the function of not driving grounding pile wh...

Страница 3: ...4 3 5 2 8 7 6 II Packaging list No Name Qty Remark 1 2 3 4 1 1 1 Charger User manual Quality certificate 5 6 7 Cable hook User card M5 12 stainless steels hex head self drilling screws 2 3 4 10 For ca...

Страница 4: ...and PE wires Connect the wires into the terminal block of the chargepoint as below Check the wiring and then close the switch and the door PE N L3 L2 L1 Model 11K 22K 11K 22K 6mm AWG9 16mm AWG5 L1 L2...

Страница 5: ...you ll need to first set the computer s IP to 192 168 1 x x can be any value between 1 and 255 except for 5 e g 192 168 1 10 To set a static IP on your Windows computer 1 Click Start Menu Control Pane...

Страница 6: ...ting can only be done via web browser on a computer It is suggested to use IE or Firefox other browser might have compatibility problem 4 2 Configure parameters 5 Select Use the following IP address a...

Страница 7: ...connected to the back office server Fig 3 4 Charger gateway The default value is 192 168 1 1 It is not suggested to change If the gateway has been reset to other value and you have forgotten the new v...

Страница 8: ...the server s time If the charger has no server connection then you ll have to reset the time every time you turn off and back on the charger Fig 12 13 Language of LCD screen Fig 13 14 Charger DNS set...

Страница 9: ...20 Fig 21 25 DC residual current sampling value calibration Enter 0 and press Set and Reboot to calibrate the DC RCD ring Fig 22 26 34 Bluetooth setting Only needs setting when the charger is equippe...

Страница 10: ...are using the ATESS APP Charging can be started stopped by pressing the ON OFF button on the APP RFID mode Charging can only be initiated or ceased by swiping RFID card RFID mode operation process flo...

Страница 11: ...g Interface of debug Hold down buttons A and B for 5s to enter the debug interface and display the serial number etc Iif the back office server and APP support reservation function and the charger is...

Страница 12: ...er via a network cable the computer s IP must be within the 192 168 1 x segment x is any value between 1 and 255 except 5 Open the web browser type in the charger s default IP of http 192 168 1 5 8080...

Страница 13: ...mware file Click Upload then update will start automatically VII Troubleshooting 7 1 Troubleshoot by LED behavior or LCD display If fault occurs users can check the fault information on the LCD or by...

Страница 14: ...h on PC Signal strength on mobile b Please check and input the correct WiFi SSID and password to retry If you check the WiFi setting on the APP please turn off and back on the charger and connect your...

Страница 15: ...eater than 75dbm 2 If the WiFi signal strength is weak it is recommended to use AP repeater to increase the signal strength which can enlarge the WiFi signal range e Check if the charger is still conn...

Страница 16: ...heck if you have input the complete content which is http 192 168 1 5 8080 in the address field do not leave out the http or the 8080 e Sometimes you may need to restart the charger to access its para...

Страница 17: ...during charging If the power consumption approaches the preset max value the charge point will reduce charge power to avoid the situation of main breaker trip due to overload It will adjust the charg...

Страница 18: ...ation Dimension mm Weight kg Display Casing Material Input Voltage Output Voltage Max current IP Protection degree Working environment temperature Relative humidity Altitude Frequency Communication St...

Страница 19: ...ntees the security and confidentiality of information 10 2 Instructions 10 2 1 APP download and install Android phone users can search and install ATS Charge through Google paly iPhone users can searc...

Страница 20: ...onsumption the duration of charging the charging rate the current current and the current voltage are displayed 10 2 6 Preset charging scheme and reservation function Preset charging scheme You can ma...

Страница 21: ...when using at the same time the lower reservation charging is only used as the start time and the reservation time period cannot be set When using the reservation function set the appointment time an...

Страница 22: ...arging stub IP gateway subnet mask network MAC address server URL DNS address Please make careful changes to the advanced settings If the settings are incorrect after modification the chargepoint may...

Страница 23: ...by verification code 10 2 10 WiFi connection configuration charger In the main interface click the WiFi connection symbol in the upper right corner to enter the WiFi connection page When the charger...

Страница 24: ...ctric pile parameters can be set Pay attention to the format restrictions of the parameters when setting the pole parameters IP address gateway mask and DNS should be filled in according to the four s...

Страница 25: ...75529988492 E mail service atesspower com 10 3 Notes Please do not download the ATS Charge APP from other sources other than Play Store and APP Store Please use the parameter setting function with cau...

Отзывы: