VP3520 User Manual
71
Rack Mounting
Before working on the rack, make sure that the stabilizers are secured to
the rack, extended to the floor, and that the full weight of the rack rests on
the floor. Install front and side stabilizers on a single rack or front
stabilizers for joined multiple racks before working on the rack.
Always load the rack from the bottom up, and load the heaviest item in the
rack first.
Make sure that the rack is level and stable before extending a device from
the rack.
Use caution when pressing the device rail release latches and sliding a
device into or out of a rack; the slide rails can pinch your fingers.
Do not overload the AC supply branch circuit that provides power to the
rack. The total rack load should not exceed 80 percent of the branch circuit
rating.
Make sure that all equipment used on the rack – including power strips and
other electrical connectors – is properly grounded.
Ensure that proper airflow is provided to devices in the rack.
Ensure that the operating ambient temperature of the rack environment
does not exceed the maximum ambient temperature specified for the
equipment by the manufacturer.
Do not step on or stand on any device when servicing other devices in a
rack.
Содержание VanCryst VP3520
Страница 1: ...ATEN VanCryst VP3520 5 x 2 True 4K Seamless Presenta on Matrix Switch with Control User Manual ...
Страница 12: ...VP3520 User Manual xii This Page Intentionally Left Blank ...
Страница 36: ...Chapter 3 Local Operation 24 This page is intentionally left blank ...
Страница 45: ...VP3520 User Manual 33 ...
Страница 68: ...Chapter 4 Remote Operation 56 This Page Intentionally Left Blank ...