
StreamLIVE™ PRO User Manual
68
4. If the firmware upgrade was successful, the first LED of the Volume Meter
LEDs will blink every 0.3 seconds. The unit will reboot after some time to
complete the process.
Note:
If the firmware upgrade fails, the last LED of Volume Meter LEDs
will blink every 0.3 seconds. Refer to
more information.
Upgrade Assessment Fail
When the upgrade assessments fail (e.g. when no USB storage device is
connected or USB drive does not have a firmware upgrade file, etc.), the
GO
LIVE
button and the last LED of Volume Meter LEDs will blink every 0.3
seconds.
Press the
GO LIVE
button to return the unit to normal operation and try again
from step 1.
0.3s
0.3s
0.3s
0.3s
&
&
Содержание StreamLIVE PRO UC9040
Страница 1: ...UC9040 StreamLIVE PRO Multi Channel AV Mixer User Manual www aten com ...
Страница 10: ...StreamLIVE PRO User Manual x This Page Intentionally Left Blank ...
Страница 22: ...StreamLIVE PRO User Manual 12 This Page Intentionally Left Blank ...
Страница 27: ...Chapter 3 ATEN OnAir PRO App Side 17 Current Project Tap the icon to edit the name of your project ...
Страница 32: ...StreamLIVE PRO User Manual 22 Export Project Tap Export Project to export and share your projects ...
Страница 38: ...StreamLIVE PRO User Manual 28 This Page Intentionally Left Blank ...
Страница 50: ...StreamLIVE PRO User Manual 40 ...
Страница 54: ...StreamLIVE PRO User Manual 44 This Page Intentionally Left Blank ...
Страница 58: ...StreamLIVE PRO User Manual 48 Stream ...
Страница 60: ...StreamLIVE PRO User Manual 50 Output ...
Страница 80: ...StreamLIVE PRO User Manual 70 This Page Intentionally Left Blank ...