Power On Time Schedule Settings
Check the
Enable Power On Time Schedule
box to use the
Power ON
Delay
setting to set the amount of time the eco PDU waits before powering
on an outlet. See
Power ON Delay
in the table on the next page.
Buzzer Setting
Checking the
Enable Buzzer Alarm
box sounds an alarm and sends
SNMP trap or e-mail alerts when a threshold setting exceeds the minimum
or maximum setting.
Outlet Reboot Setting
Checking the
Enable Outlet Sequential Reboot
box allows you to
sequentially reboot all outlets by pressing the Power Control Button of
Outlet 1 for more than 8 seconds.
Bank POP Priority List
Use the eight drop-down menus to set the priority for when Proactive
Overload Protection powers off the outlets. The outlet set as
Priority1
will
be powered off first, Priority2 will be powered off second, and so on.
Outlets set to
N/A
will not be powered off when Proactive Overload
Protection is triggered.
To change the Priority List, set at least two drop-down menus to
N/A
.
Outlets set to
N/A
become available for selection in the Priority drop-
down menus. An easy way to reconfigure all outlets is to set all drop-down
menus to
N/A
and then go back select an outlet for each Priority1~8
setting. Outlets set to
N/A
will not be powered off when Proactive
Overload Protection is triggered.
Содержание PE6208AV
Страница 1: ...PE6108AV PE6208AV PE8208AV 8 Outlets eco PDU User Manual www aten com...
Страница 20: ...PE6108AV PE6208AV PE8208AV User Manual 10 This Page Intentionally Left Blank...
Страница 76: ...PE6108AV PE6208AV PE8208AV User Manual 66 This Page Intentionally Left Blank...
Страница 91: ...Appendix 81 Do not connect the RJ 11 connector marked Sensor to a public telecommunication network...
Страница 112: ...PE6108AV PE6208AV PE8208AV User Manual 102...