
Chapter 4. Browser Operation
35
Bank POP Priority List
Use the eight drop-down menus to set the priority for when Proactive
Overload Protection powers off the outlets. The outlet set as
Priority1
will
be powered off first, Priority2 will be powered off second, and so on.
Outlets set to
N/A
will not be powered off when Proactive Overload
Protection is triggered.
To change the Priority List, set at least two drop-down menus to
N/A
.
Outlets set to
N/A
become available for selection in the Priority drop-
down menus. An easy way to reconfigure all outlets is to set all drop-down
menus to
N/A
and then go back select an outlet for each Priority1~8
setting. Outlets set to
N/A
will not be powered off when Proactive
Overload Protection is triggered.
Содержание PE6208AV
Страница 1: ...PE6108AV PE6208AV PE8208AV 8 Outlets eco PDU User Manual www aten com...
Страница 20: ...PE6108AV PE6208AV PE8208AV User Manual 10 This Page Intentionally Left Blank...
Страница 76: ...PE6108AV PE6208AV PE8208AV User Manual 66 This Page Intentionally Left Blank...
Страница 91: ...Appendix 81 Do not connect the RJ 11 connector marked Sensor to a public telecommunication network...
Страница 112: ...PE6108AV PE6208AV PE8208AV User Manual 102...