Chapter 4. Operation
35
The Bottom Panel
The bottom panel allows you to control the power status of your outlet groups.
Outlets can be placed into groups so that Power On/Off actions can be carried
out on the entire outlet group at the same time, rather than performing the same
action on each outlet individually. Clicking the group's
On
or
Off
Power Button
(the rocker switch icons) performs the power action that was set by the
administrator for each of the outlets.
Note:
1. Users must have permission to operate all the ports in a group in order
to use this function. If a user doesn't have permission to operate any
port in the group, clicking the Power Button has no effect.
2. If some ports in a group are ON and some are OFF, and you click the
OFF button, the ports that are ON turn OFF. The ports that are OFF
remain OFF. Likewise, if you click the ON button, the ports that are
OFF turn ON, while the ports that are ON remain ON.
Details about creating and configuring power outlet groups are described in the
Configuration
section of the Administration chapter (see page 38).
pn0108.book Page 35 Friday, December 14, 2007 4:15 PM
Содержание ALTUSEN PN0108
Страница 1: ...Power over the NET PN0108 User Manual www aten com pn0108 book Page i Friday December 14 2007 4 15 PM...
Страница 10: ...PN0108 User Manual x This Page Intentionally Left Blank pn0108 book Page x Friday December 14 2007 4 15 PM...
Страница 18: ...PN0108 User Manual 8 This Page Intentionally Left Blank pn0108 book Page 8 Friday December 14 2007 4 15 PM...
Страница 24: ...PN0108 User Manual 14 This Page Intentionally Left Blank pn0108 book Page 14 Friday December 14 2007 4 15 PM...
Страница 46: ...PN0108 User Manual 36 This Page Intentionally Left Blank pn0108 book Page 36 Friday December 14 2007 4 15 PM...
Страница 86: ...PN0108 User Manual 76 This Page Intentionally Left Blank pn0108 book Page 76 Friday December 14 2007 4 15 PM...
Страница 92: ...PN0108 User Manual 4 pn0108 book Page 4 Friday December 14 2007 4 15 PM...