ATECPOOL SIROCCO HEAT PUMP > User Manual
8
IV.
Running Test
1. Inspection Before Running Test
a. Please run an inspection test after completing installation;
b. Before running test, confirm below items and write √ in the block;
●
Unit installed correctly □
●
Power supply voltage is the same as unit rated voltage □
●
Correct piping and wiring □
●
Air inlet and outlet ports from the air unit unblocked □
●
Drainage and venting are unblocked and no water leaking □
●
Leakage protector is working □
●
Piping insulation is working □
●
Ground wire is connected correctly
□
c. All wiring and piping should be connected well and carefully checked, then fill the water
tank with water before power is switched on;
d. Empty all air within pipes and from water tank, then press “on-off” button on control
panel to run the unit at setting temperature;
Содержание SIROCCO AIHP115
Страница 2: ...ATECPOOL SIROCCO HEAT PUMP User Manual ...
Страница 23: ...ATECPOOL SIROCCO HEAT PUMP User Manual 20 When device type selected go to add device interface ...
Страница 24: ...ATECPOOL SIROCCO HEAT PUMP User Manual 21 ...
Страница 27: ...ATECPOOL SIROCCO HEAT PUMP User Manual 106 10020 017 ...