CHAPTER 2. HARDWARE (66/110-Type)
CONNECTS
TO 16-PORT
ANALOG
LINE
CIRCUIT
PACK
CONNECTS
TO CROSS-
CONNECT
FIELD
(NOTE)
LEGEND:
M = 25-PAIR MALE CONNECTOR
F = 25-PAIR FEMALE CONNECTOR
NOTE: AN A25D CABLE MUST BE USED BETWEEN
THE ADAPTER CABLE AND THE 110-TYPE
TERMINAL BLOCK.
Figure 2-22. 16-Port Analog Line Circuit Pack Adapter Cable (853B
Adapter)
The adapter cable is 8 feet long and can be ordered with the TN746
circuit pack. The adapter cable is coded as a 853B adapter and can be
ordered as follows.
16-PORT ANALOG LINE
ADAPTER CABLE ORDERING INFORMATION
Description
Comcode
853B Adapter
104 305 834
4-Port Met Line Circuit Pack Concentrator Cable
The MET line circuit pack (TN735) contains four 3-pair circuits that
appear on a 25-pair connector at the switch. The WP-90929, List 3 and
List 4 cable assemblies shown in Figures 2-19 and 2-20, respectively
combine the MET line circuits appearing on two 25-pair connectors (at
the switch) into one 25-pair connector at the opposite end of the cable.
2-46
Содержание System 75
Страница 1: ...AT T AT T System 75 and System 75 XE Wiring...
Страница 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Страница 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Страница 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Страница 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Страница 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Страница 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Страница 98: ...Typical System Equipment Room Floor Plans 3 15...
Страница 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Страница 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Страница 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Страница 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Страница 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Страница 203: ...CHAPTER 4 STATION WIRING Figure 4 4 3 Pair to 4 Pair Wiring Labeling From Equipment Room to Information Outlet 4 6...
Страница 205: ...CHAPTER 4 STATION WIRING Figure 4 5 4 Pair Station Wiring Labeling From Equipment Room to Information Outlet 4 8...
Страница 212: ...Adjunct Powering 4 15...
Страница 214: ...Adjunct Powering 4 17...
Страница 216: ...Patch Cord Jumper Installation And Administration 4 19...
Страница 241: ...CHAPTER 4 STATION WIRING 4 44...
Страница 244: ...Miscellaneous Wiring Installation 4 47...
Страница 246: ...Miscellaneous Wiring Installation 4 49...
Страница 252: ...Miscellaneous Wiring Installation 4 55...
Страница 254: ...Miscellaneous Wiring Installation 4 57...
Страница 277: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION Figure 5 1 Connections for Loudspeaker Paging and Music on Hold 5 4...
Страница 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Страница 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...