![AT&T PARTNER II Release 3.1 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/atandt/partner-ii-release-3-1/partner-ii-release-3-1_installation-manual_2993845014.webp)
D) To power up the control unit, push in the main
circuit breaker on the expansion carrier first,
and then push in the main circuit breaker on
the primary carrier.
Lights
On a PARTNER
II
220V system, move the
on/off switch to the “on” position (“I”).
7
Check all green lights on the fronts of the modules.
If all lights are lit, you can go to the next section;
otherwise:
A) If a single light is out, power down the control
unit, reseat the module, then power up the
control unit.
If multiple lights are out, power down the
control unit, reseat the leftmost module that
has a light out, then power up the control unit.
B) If the lights are still out, call for support as
instructed on the inside front cover.
555-1343
555-1344
555-1345
555-1346
Connecting Lines and Extensions
If extensions are not wired to any modular jacks, call a
qualified service technician.
Network
Interface
Jacks
1
A)
B)
C)
2
A)
B)
C)
Test for dial tone at the network interface jacks
before connecting outside lines to the control
unit. For the test, connect a standard phone
to the first network interface jack.
Lift the handset and listen for dial tone. (If there
is no dial tone, contact your local telephone
company before continuing.)
Repeat for each network interface jack.
Connect line cords to the line jacks on 206 and
400 modules, starting with the top line jack on
the leftmost 206 module.
Route each cord through the hook on the front of
the module, then push the cords through the
space below the module and out through the
back.
Pull the cords from behind the backplane,
leaving at least two feet (0.6 meters) of slack
in the cords (for future maintenance, so you
can easily reconnect cords after replacing
system modules).
3
Connect the free end of each line cord to the
appropriate network interface jack.
10
Installation Procedures