7
Concrete Walls:
1. Place the wall mount flat against the wall in the desired location. Use the wall plate as a template
to mark the location of all four mounting holes on the wall. Make sure that the mounting holes are
level and are parallel.
2. Use a 10 mm drill bit to pre-drill four holes at least 50 mm (2 inches) deep at the marked locations.
3. Insert a wall anchor (I) into each pre-drilled hole and lightly tap it with a hammer until the wall anchor
is flush with the wall.
4. Use the supplied four long bolts (H), and washers (G) to attach the wall mount to the wall with the
wall anchors.
5. Use the Bubble level (J) to level the wall mount (Fig 3d), repositioning as necessary, then securely
tighten the bolts.
Concrete Wall
2 (50mm)
”
Φ
3/8 (10mm)
”
H
G
I
Bubble level
Fig. 3d
J