41 / 50
ASSEMBLY INSTRUCTION
STEP 5
1. The Instrument Tube Assembly (46) is inserted into the main frame. You will have to
select the desired height.Then tighten the knob(55) .
2. The Handrail (47) is fixed on the Instrument Tube Assembly (46) with the L hold-
down bolt (50) and put the
Decorative Cover (49) on the
Handrail (47).
3. The Computer (86) is fixed on the Instrument Tube Assembly (46) with four bolts;
connect the Plug (A1&A2). The Plug (B1) of the pulse line plug into the pulse sensing
hole on the back of the Computer (86).
Содержание C24
Страница 1: ......
Страница 6: ...6 50 EXPLOSIONSZEICHNUNG L R ...
Страница 7: ...7 50 EXPLOSIONSZEICHNUNG ...
Страница 10: ...10 50 TEILELISTE NO NO 6 CARRIAGE BOLT M8 52 NO DOMED NUT M NO 3 NUT 1 2 NO BOLT NO SPRING WASHER NO ...
Страница 32: ...EXPLODED DIAGRAM L R ...
Страница 33: ...33 50 EXPLODED DIAGRAM ...
Страница 36: ...36 50 PARTLIST NO NO 6 CARRIAGE BOLT M8 52 NO DOMED NUT M NO 3 NUT 1 2 NO BOLT NO SPRING WASHER NO ...