background image

16

Firebrick Liner Installation

It is required that the interior sides, rear and bottom be lined 

with minimum 1-1/8” thick firebrick. Pre-fabricated fire brick liner 

walls can make the installation easier.

 

All required through-wall accesses (gas and electrical 

line feeds and combustion air supply access holes) should be 

drilled before the required fire brick lining is installed.

Modular Firebrick Lining

If  using  IHP  Firebrick  Liners,  simply  use  an  extra  bucket 

of  mortar.  Install  Hearth  Liner  first,  rear  next  and  sides  last. 

Consider if brackets for grates will be required, also if pre-drilling 

is required for gas lines, electrical or if the outside combustion 

air kit is to be installed.
The following Firebrick Patterns are available from IHP:

MM(XX)SHBL- Herring Bone

Figure 30

MM(XX)FRBL- Running Bond

Figure 31

Initial Fireplace Operation

 

Follow the gas appliance manufacturers’ requirements 

for lighting and operating your vent free log. When first operating 

the fireplace, open a window in the room to allow smells created 

from the heater and fireplace curing.

 

We suggest operating the heater for several 30 minute 

intervals allowing the fireplace to cool for an hour in between. 

This  will  allow  any  moisture  in  the  brick  and  fireplace  to 

escape.

 

Keep  in  mind  that  it  may  require  several  operations 

to completely remove any smell from the operation of a vent-

free  heater  and  fireplace.  If  this  condition  continues,  contact 

your gas appliance dealer to inspect the gas heater for proper 

operation.

You  may  have  further  questions  about  installation, 

operation,  or  troubleshooting.  Please  contact  your 

IHP dealer for any questions or concerns a. When 

calling your dealer please have your model and serial 

numbers of your fireplace ready. You can also visit our 
web site at 

www.Astria.US.com

Note:

 Use only original replacement parts.

This  will  protect  your  warranty  coverage  for  parts 

replaced under warranty.

Contact authorized dealers of this product. To locate 

a dealer in your area contact IHP at 1-800-655-2008. 

You can also visit our web site at www.Astria.US.com.

When calling your dealer, have ready:

•  your name

•  your address

•  model and serial numbers of your fireplace

•  how fireplace was malfunctioning

•  purchase date

Usually,  we  require  that  the  part  is  returned  to  the 

factory.

Technical Service

Replacement Parts

Содержание MM39VF

Страница 1: ...tes and approved by PFS under ANSI Z21 91 for use with any ANSI Z21 11 2 approved gas logs FOR USE ONLY WITH A LISTED GAS FIRED UNVENTED DECORATIVE ROOM HEATER NOT TO EXCEED 40 000 BTU HR DO NOT BUILD...

Страница 2: ...2007 VENTLESS FIREBOX ENCLOSURES FOR GAS FIRED UNVENTED DECORATIVE ROOM HEATERS FOR USE WITH LISTED ANSI Z21 11 2 2013 UNVENTED DECORATIVE ROOM HEATERS NOT TO EXCEED 40 000 BTU HR 0 10 NO PROJECTIONS...

Страница 3: ...d Diagram 5 9 12 2 7 1 3A 2X 2X 3X 7X 2X 8X 3 6 11 WARNING Failure to position the parts in accordance with these diagrams or failure to use only parts specifically approved with this appliance may re...

Страница 4: ...place Parts List ITEM P N DESCRIPTION QTY 1 MFP39 1 MFP44 1 MFP49 1 HEARTH Left or Right 2 2 MFP39 2 MFP44 2 MFP49 2 REAR WALL 4 3 MFP39 3 MFP44 3 MFP49 3 SIDE WALL 7 3A MFP39 3A MFP44 3A MFP49 3A SID...

Страница 5: ...rd 1 1 8 thick high temperature refractory brick is required to line the interior of the firebox These fireplaces are not intended to serve as a primary heat source rather the fireplace was expressly...

Страница 6: ...ace if not enough fresh air is available See Air for Combustion and Ventilation page 8 If the fireplace keeps shutting off see appliance manufacturers troubleshooting instructions 9 Do not run firepla...

Страница 7: ...ian fireplace Check with the local jurisdiction before you get started Supporting Floor Systems Floor Framing It is important to take into consideration that the load for the Grand Meridian Fireplace...

Страница 8: ...Meridian Fireplace must be considered as additional dead load that will have to be supported by the floor framing Additional floor joists or I joists may be required as determined by the licensed desi...

Страница 9: ...or wood structural members having a moisture content of less than 16 per cent at time of installation and used under dry conditions the deflection resulting from L 0 5D is permitted to be substituted...

Страница 10: ...designed to be custom finished with facing trim and mantle to be an owner option However all such trim material must meet standard fireplace code requirements Non combustible facing material must be...

Страница 11: ...he house to operate You must provide adequate fresh air for these appliances This will insure proper venting of vented fuel burning appliances Non combustible Flex Hose Figure 16 Exterior Providing Ad...

Страница 12: ..._ Btu hr Total _ _______ Btu hr Example Gas water heater 40 000 Btu hr Vent free fireplace 36 000 Btu hr Total 76 000 Btu hr Do not include direct vented gas appliances Direct vent draws combustion ai...

Страница 13: ...to assembly This will minimize shrinkage and cracks developing in the joint areas Best way to accomplish this is with a bucket of water and a large sponge Dip sponge into water and apply a liberal amo...

Страница 14: ...28 Apply mortar between joints 12 inch rebar 2 Mix a batch of mortar and prepare Right Side Hearth bottom surface to be bonded as shown in Figure 18 Figure 18 1 2 AWAY FROM EDGES 1 2 MORTAR BEAD TYPIC...

Страница 15: ...36 rebar to all cells as shown in Figure 22 The rebar should enter the holes in the Hearth and lie adjacent to the 12 rebar secured in subfloor Then fill cells with approx 2 cu ft Ready Mix Concrete F...

Страница 16: ...Fuel Gas Code ANSI Z223 1 This gas pipe provision must only be connected to an approved vent free gas log heater certified to ANSI Z21 11 2 heater standard Check local building codes for specific pip...

Страница 17: ...e curing We suggest operating the heater for several 30 minute intervals allowing the fireplace to cool for an hour in between This will allow any moisture in the brick and fireplace to escape Keep in...

Страница 18: ...ncrete slab The concrete strength and durability shall comply with Sections 1903 1904 and 1905 of the International Building Code IBC TABLE R402 2 MINIMUM SPECIFIED COMPRESSIVE STRENGTH OF CONCRETE MI...

Страница 19: ...ly b Lines defining areas are approximate only Local conditions may be more or less severe than indicated by region classification A severe classification is where weather conditions result in signifi...

Страница 20: ...ect for any injury or damage to the building or structure in which the fireplace has been installed or to the persons or property therein arising out of the use misuse or installation of properly manu...

Отзывы: