background image

60

M5x

50mmM5x

60mm

M5x

15mm

M6x

20mm

A

M4x

6mm

8gx25

mm

(T1) X 2

100

10211 ZINS-Z912-43

15

• Screw body in place using screws as shown.

• Assemble arm to pinion as shown.

• Secure arm and rail foot with screw provided.

22.5

(M4) X 1

(T2) X 4

(B1) X 1

48

4 body mounting holes and 2 track holes as indicated on this sheet.

If Hold Open is not required do not tighten HO screw.

Slip rail foot into track and insert end caps.

Push track and arm towards frame and secure in position.

EN1

750mm

20kg

9Nm

13Nm
18Nm

8

7

175

175

175

Timber      drill     3

Metal        drill     4.2  and  tap  M5 

(B1) x 1

(M1) x 2

M6x20mm

(C1) x 1

M5x50mm

(M2) x 4

M5x50mm

(T1) x 2

10gx50mm

(T2) x 4

10gx50mm

(Full Cover 

only)

(A1) X 2

M6x10mm





Instructions 724_SLIDE 

ARM PULL

 SIDE NOVE 2013

Отзывы: