ASRock INC. hereby declares that this device is in compliance with the essential require-
ments and other relevant provisions of related UKCA Directives. Full text of UKCA decla-
ration of conformity is available at: http://www.asrock.com
ASRock INC. hereby declares that this device is in compliance with the essential require-
ments and other relevant provisions of related Directives. Full text of EU declaration of
conformity is available at: http://www.asrock.com
ASRock follows the green design concept to design and manufacture our products, and
makes sure that each stage of the product life cycle of ASRock product is in line with global
environmental regulations. In addition, ASRock disclose the relevant information based
on regulation requirements.
Please refer to https://www.asrock.com/general/about.asp?cat=Responsibility for informa-
tion disclosure based on regulation requirements ASRock is complied with.
DO NOT throw the motherboard in municipal waste. This product has been
designed to enable proper reuse of parts and recycling. This symbol of the
crossed out wheeled bin indicates that the product (electrical and electronic
equipment) should not be placed in municipal waste. Check local regulations
for disposal of electronic products.
CE Warning
This device complies with directive 2014/53/EU issued by the Commision of the
European Community.
This equipment complies with EU radiation exposure limits set forth for an
uncontrolled environment.
This equipment should be installed and operated with minimum distance 20cm
between the radiator & your body.
Содержание Z790 Taichi Carrara
Страница 1: ......
Страница 23: ...19 Z790 Taichi Carrara 2 2 Installing the CPU Fan and Heatsink 1 2 C P U _ F A N...
Страница 25: ...21 Z790 Taichi Carrara 1 2 3...
Страница 27: ...23 Z790 Taichi Carrara 2 5 Installing the Motherboard Z79O taichi Carrara...
Страница 28: ...24 2 6 Installing SATA Drives 1 2 Optical Drive SATA Drive SATA Data Cable...
Страница 29: ...25 Z790 Taichi Carrara 3 4 SATA Power Connector SATA Data Connector...
Страница 30: ...26 2 7 Installing a Graphics Card 1 CLICK...
Страница 32: ...28 2 8 Connecting Peripheral Devices...
Страница 33: ...29 Z790 Taichi Carrara 2 9 Connecting the Power Connectors 7 3 5 7 9...
Страница 34: ...30 2 10 Power On 2 3 4 1...