background image

It is always recommended to anchor the unit in to the ground. Drill 

through the four holes in the base of the unit using 6mm dia masonry drill 

to a depth of 70mm. Screw in the anchor fixings. (These have a self 

cutting thread). If not anchoring the unit, fit the self seal plugs BEFORE 

BUILDING to block the fixing holes from underneath. 

TOOLS REQUIRED

Power driver POSI-DRIV screwdriver, 6mm dia. masonry drill and a

10mm socket or spanner.

ACCESS

ZSCREW32  

x4

ZSCREW381 

x12

ZSCREW100  

x60

ZSCREW340  

x12

41843  

x1 /

41844  

x1

ZHWMISC89  

x2

ZHWHANDLE32  

x1

ZSCREW42 

x4

45767  

x4

41824  

x2

41459  

x4

6mm  

Dia.

Posi-Driv

Screwdriver

10mm 

Spanner

18V

ZCOMPPLZS02  

x8

ZCOMPPLAS22-23-24  

x12

4x  2mm, 4x 3mm, 4x 5mm

BASE P

ANEL

 40966 

x1

LH BACK P

ANEL

 41341 

x1

RH BACK P

ANEL

 41342 

x1

RH SIDE P

ANEL

 41331 

x1

LH SIDE P

ANEL

 41329 

x1

LH FRONT

 P

ANEL

 41452 

x1

RH FRONT

 P

ANEL

 41453

 x1

RH DOOR S/A

 41350 

x1

LH DOOR S/A

 41348 

x1

LID S/A

 40961 

x1

BASE INSTRUCTIONS

Flat and firm base. Recommended: concrete, tarmac or paving flags. 

Min. distance from walls/ shrubbery: 1000mm.

Min. base size (WxDxH) 2200mm x 1150mm x 50mm.

LEVELING THE UNIT

Correctly level the constructed unit using the shims (ZCOMPPLAS) 

provided prior to fixing the unit to the ground. Slide the packing pieces 

under the corners of the unit base as required until an equal gap has 

been achieved around the door allowing for its smooth operation and 

alignment. 

For maintenance instructions of this product visit www.asgardsss.co.uk

x2

Warning: some panels may weigh over 

20Kg. Beware of manual handling

ZHWNUT41  

x12

ZSCREW43 

x10

2x 70mm disc padlocks 

required. Not supplied. 

Keys alike recommended.

All manuals and user guides at all-guides.com

Отзывы: