Asetek InRackCDU Installation, Operation & Maintenance Guide 24
Appendix IV – Installation of InRackCDU in PCR-M2 rack
Important: Do not power on server node until installation is completed. In addition, perform the
installation and powering up in the sequence described in
Chapter”6.4
the first time the rack is powered on after installation in the factory.
Vertiv Rack isEMEA market, and CEC Rack is no EMEA market(US, JP, APAC, etc).
The CDM-holder kit is installed in the rack on the rear side as shown below.
Fig: 1PCR-M2 Rack with CDM-Holder (PDU BRACKET DCM RACK H2000)
Fig: RackCDU with CDM in rear only
CDM-Holder Kit
A3C40195628
197
mm
CDM-Holder
P/N: A3C40196331
36mm
53mm