Asetek InRackCDU Installation, Operation & Maintenance Guide 21
recycling center for glycol or anti-freeze. Alternatively, they may be disposed of in an incinerator or other
thermal destruction device.) Do not dump quantities over 1quart into any sewers on the ground or into
any body of water! Dilute any quantities less than 1 quart by at least 5 to 1 before dumping into sanitary
sewers.
After collecting the spill, return to the spill area with half a bucket of fresh water and rinse area with
towels and clean water, wringing rinse water back into bucket. Dump this rinse water into a sink drain and
wring towels. Allow cloth towels dry and then wash. Dry and incinerate paper towels. Flush liquid
collection equipment with plenty of fresh water to clean.
Appendix II - CDU Specifications
Parameter
Specification
Dimension (L x W x H)
73.7cm x 44.4cm x 17.8cm (length is just for cabinet without hoses)
Weight, including coolant
CDU Cabinet: 80kg (176.4lbs)
CDM (pair):
42U: 10kg (22.0lbs)
48U: 12kg (26.5lbs),
Facility Water Pressure
Max: 8.62 bar (125 PSI)
Facility Flow Rate
1¼ inch facility hose: Max 5200 l/h (23 GPM)
1½ inch facility hose: Max 7900 l/h (35 GPM)
Cooling capacity is influenced by facility flow rate, max cooling capacity is
obtained with max facility flow
Electrical Requirements
Power Supply Voltage: 100VAC to 240VAC, 50/60Hz, auto-range
Connector: IEC320 C14 (male)
Power Consumption: 70W Max, 15W Normal Operation
Electrical Requirements
Physical Layer: Copper wire, RJ-45 Connector
Application Layer: Web browser interface, SNMP, e-mail alerts & alarms