CZ
10
Initial start
PP10 is switched on by connecting to the power supply. PP10power supply
must be connected together with the power supply of the circulation pump.
Switching off the circulation pump must switch off the PP10, otherwise incor-
rect dosing would occur.
It is advisable to test the connecting pipe tightness before normal usage.
After starting the device, dosing starts. Visually check the dosing liquid for
leaks at any joint. After switching off the device, check that the liquid in the
hose does not fall back.
Initial setup
PP10 PRG
1.
When the mains cable is plugged in, the LED display of the device lights
up.
2.
Press any + or - button to switch the device to setting mode. In setting
mode, the display starts fl ashing.
3.
Use the + and - buttons on the display to set the hour dose. One press
changes the value by one unit, holding the button changes the displayed
value faster.
4.
After completing the setting, the display fl ashes for approx. 10 seconds
and then the pump automatically starts the set dosing.
PP10 12V
After connecting the pump, it continuously doses 10 ml / m.
Содержание PP10
Страница 1: ...USER MANUAL PP10 EN PROGRAMMABLE PERISTALTIC PUMP FOR SLOW CONTINUOUS DOSING www asekopool com ...
Страница 9: ...EN 9 Max 8 m Max 8 m Max 2 m TO POOL Heating FROM POOL Besgo Coagulation mixer Sampling point ...
Страница 14: ...EN 14 ...
Страница 15: ...CZ 15 ...
Страница 16: ...www asekopool com PP10 USER S MANUAL EN ...