ASC 2-1/2

Light Gauge Metal Roof 

and Wall Panels

Installation Guide for Delta Rib, Delta Rib III,

Nor-Clad

®

, Strata Rib

®

 & 2

1

2

 Corrugated

Содержание 2-1/2" Corrugated

Страница 1: ...Light Gauge Metal Roof and Wall Panels Installation Guide for Delta Rib Delta Rib III Nor Clad Strata Rib 21 2 Corrugated...

Страница 2: ...ration 20 Gable Flashing Preparation at Ridge 21 Peak Flashing 22 Sidewall Flashing 23 Endwall Flashing 24 Vented Endwall Flashing 25 Section Slope Transition High to Low Slope 26 Slope Transition Low...

Страница 3: ...ips will be required for left edge right edge and centerline cuts Electrical Metal Shears Used for general metal cutting such as at the hips and valleys Note Some erectors prefer to use circular power...

Страница 4: ...e ground Wear clean cotton gloves when handling unpainted ZINCALUME coated panels or flashings to avoid discoloration Rollforming die marks which appear black particularly at bends will be visible Wea...

Страница 5: ...ed This line must be parallel to the gable edge of the roof deck and square with the eave line Check the roof for squareness by making a 3 line across the eave See illustration 2 Completing the 3 x 4...

Страница 6: ...emove all moss and other debris from the roof 5 Cut off any overhanging roofing flush with the roof deck and remove all hips ridge caps and penetration flashings 6 Metal debris shavings should be remo...

Страница 7: ...PE FLASHING BASE TRIM OUTSIDE CORNER C METAL INSIDE CORNER MAXIMUM RECOMMENDED FASTENER ROW SPACING 1 2 Plywood 36 5 8 Plywood 42 2 x 4 36 Notes Lap panels away from prevailing weather Use only those...

Страница 8: ...by ASC Building Products Refer to the panel installation flashing details and fastener placement pages of this manual for specific fastener usage See page 6 for fastener spacing Panel attachment screw...

Страница 9: ...y trim and inside closure prior to panel installation 2 Align the edge of the first panel with the alignment line constructed along the start gable See page 4 item 4 and illustration 3 below Allow the...

Страница 10: ...URES ASC S LIGHT GAUGE ROOFING 3 12 x 3 4 STITCH SCREW OR 4 14 x 7 8 LAP SELF DRILLER EACH RIB OR 8 O C FOR CORRUGATED 3 3 4 1 2 135 TYP 3 8 H Hip Ridge Flashing Procedures Caulk the bottom and sides...

Страница 11: ...III Nor Clad Strata Rib 2 Corrugated Universal Ridge Termination UNIVERSAL RIDGE R1 BUTYL MASTIC TAPE OR NEOPRENE CLOSURE REMNANTS TO CLOSE OFF THE RIDGE 3 STITCH SCREW 1 2 FROM EDGE OF GABLE GABLE C...

Страница 12: ...ch the screen at each panel rib sandwiching the top closure in place Ensure screen is pulled tight to avoid sagging Fasten the vented ridge using stitch screw at each rib or 8 o c for corrugated Caulk...

Страница 13: ...tion Guide for Delta Rib Delta Rib III Nor Clad Strata Rib 2 Corrugated Vented Ridge Hip Termination CUT AND TRIM SIMILAR TO GABLE SEE PAGE 21 FOLD DOWN OVER END TABS CUT AT BENDS 1 AND FOLD IN 90 VEN...

Страница 14: ...f 1 2 butyl mastic tape sealant spaced as shown The polyethylene closures cannot be installed diagonally across a panel At mitre cuts use emseal closures at a right angle to the panel ribs Field cut t...

Страница 15: ...llation Guide for Delta Rib Delta Rib III Nor Clad Strata Rib 2 Corrugated 1 1 4 MIN VALLEY FOLD TABS DOWN 90 REMOVE THIS MATERIAL SEE VALLEY PAGE 13 FOR FASTENING SEALING REQUIREMENTS EAVE FILL END W...

Страница 16: ...ND ROOFING NAILS 24 O C 1 2 1 3 8 1 3 8 2 1 2 3 8 HEM 3 3 8 4 3 8 3 8 HEM 1 2 3 2 1 2 3 1 2 3 1 2 4 3 8 2 1 1 2 1 2 3 2 Procedures Carpentry must be completed as indicated prior to installation of the...

Страница 17: ...uide for Delta Rib Delta Rib III Nor Clad Strata Rib 2 Corrugated 1 1 REMOVE THIS MATERIAL EAVE REMOVE THIS MATERIAL EAVE BEND TABS HERE 90 Eave Flashing Preparation Use this flashing where eave meets...

Страница 18: ...ter Attach eave flashing using roofing nails evenly spaced at 24 o c Caulk and lap the flashing a minimum of 3 see page 44 Panels should overhang the eave a minimum of 1 ASC Building Products recommen...

Страница 19: ...T GAUGE ROOFING 3 12 x 3 4 STITCH SCREW OR 4 14 x 7 8 LAP SELF DRILLER 24 O C GABLE G4 2 14 x 1 METAL WOOD 24 O C G1 G3 G4 Procedures Place the first roof panel according to the instructions on pages...

Страница 20: ...o Endwall ASC S LIGHT GAUGE ROOFING GABLE OR SIDEWALL 2 BUTYL MASTIC TAPE WITH FASTENERS 2 O C RIDGE OR ENDWALL GABLE BEND HERE 90 RIVET INSERT EAVE TAB BEHIND GABLE EAVE ASC S LIGHT GAUGE ROOFING GAB...

Страница 21: ...IAL SEE TABLE FOR DIMENSION GABLE SNIP HERE REMOVE THIS MATERIAL 2 1 2 1 1 2 1 1 2 SNIP HERE 1 1 GABLE FOLD 90 REMOVE THIS MATERIAL GABLE REMOVE THIS MATERIAL SEE TABLE FOR DIMENSION GABLE SNIP HERE R...

Страница 22: ...LE RIVET GABLE REMOVE THIS MATERIAL WITH SNIPS OR POWER SHEARS EQUAL EQUAL VERTICAL CUT SEE TABLE REMOVE THIS MATERIAL WITH SNIPS OR POWER SHEARS REMOVE THIS MATERIAL WITH SNIPS OR POWER SHEARS RIDGE...

Страница 23: ...T ALL AROUND 3 12 x 3 4 STITCH SCREW OR 4 14 x 7 8 LAP SELF DRILLER EACH RIB OF 8 O C FOR CORRUGATED ASC S LIGHT GAUGE ROOFING 6 1 2 3 8 HEM 3 8 HEM 5 Peak Flashing PF2 Procedures Caulk the bottom and...

Страница 24: ...AROUND UNIVERSAL SIDEWALL SW1 BUTYL MASTIC TAPE ASC S LIGHT GAUGE ROOFING 2 14 WOOD SCREW 24 O C 1 1 8 3 8 HEM 5 8 3 4 Sidewall Flashing This flashing must be installed prior to wall panels SW1 SW2 Pr...

Страница 25: ...CH SCREW 14 x 7 8 LAP SELF DRILLER EACH RIB OR 8 O C FOR CORRUGATED OR UNIVERSAL ENDWALL EW1 ASC S LIGHT GAUGE ROOFING TOP POLYETHYLENE CLOSURE SET IN SEALANT ALL AROUND 2 14 x 1 WOOD SCREW SEE ILLUST...

Страница 26: ...screws Place a small length of sealant on top of each rib as shown Caulk and lap the flashing a minimum of 3 see page 44 For Profile Vent use EW1 for vented endwall flashing detail 6 3 4 1 7 8 3 8 HE...

Страница 27: ...L AROUND 2 14 WOOD SCREW SEE ILLUSTRATION ON PAGE 7 WOOD BLOCKING 3 8 HEM SLO PE S1 SLOPE S2 6 5 SPECIFY ANGLE Slope Transition High Slope to Low Slope This flashing must be installed prior to uphill...

Страница 28: ...EVERY THIRD RIB FOR CORRUGATED SLOPE S1 SLOPE S2 5 6 3 8 HEM SPECIFY ANGLE Slope Transition Low Slope to High Slope This flashing must be installed prior to uphill panels Procedures Install sealant o...

Страница 29: ...dures Attach the chalet flashing using color matched woodscrews spaced at 24 o c Parallel to the face of the flashing place 1 2 butyl mastic tape as shown The polyethylene closures cannot be installed...

Страница 30: ...shown on page 17 The adjustable gable trim pieces shown above can assist in a proper roof in stal la tion When a major rib on a Light Gauge panel occurs over the roof area within 3 of the edge of the...

Страница 31: ...ming A stainless steel draw band should be installed at the top of the vent pipe flashing A minimum drainage area of 2 should be maintained between the base of the flexible vent pipe flashing and the...

Страница 32: ...ater to lubricate if necessary STEP 4 Seal Seal the Flashers by applying urethane silicone sealant between the Flasher and the roof Use a large slot screwdriver to press the base down tightly STEP 5 F...

Страница 33: ...O C BUTYL MASTIC TAPE ASC S LIGHT GAUGE ROOFING Skylight Flashing Wherever possible position the skylight curb so the ribs of the roof panels do not interfere with the flashing Cut the light gauge ro...

Страница 34: ...lding Products A Division of ASC Profiles LLC 6 MIN 2 1 2 3 1 2 12 BOTTOM POLYETHYLENE CLOSURE SET IN SEALANT ALL AROUND ASC S LIGHT GAUGE ROOFING 2 14 WOOD SCREW EACH SIDE OF EACH RIB OR 8 O C FOR CO...

Страница 35: ...Rib III Nor Clad Strata Rib 2 Corrugated 5 2 1 2 3 8 HEM 3 12 x 3 4 STITCH SCREW EACH RIB OR 8 O C FOR CORRUGATED TOP POLYETHYLENE CLOSURE SET IN SEALANT ALL AROUND DOWNHILL SKYLIGHT SK17 ASC S LIGHT...

Страница 36: ...Skylight Flashing Preparation RIGHT SIDE UPHILL Trim and bend the right side skylight flashing as indicated Trim the left side in a similar fashion The skylight flashing will be 4 wider than the width...

Страница 37: ...ERE 90 REMOVE THIS MATERIAL CUT HERE REMOVE HEM TO FOLD LINE Skylight Flashing Preparation continued Trim both ends of the uphill and downhill sides of the skylight flashing as indicated Slide the uph...

Страница 38: ...cedures for the installation of chimney flash ings are similar to the skylights see pgs 33 36 The reglet shown may be deleted if the chimney is clad with siding Lap the siding over the flashing and ca...

Страница 39: ...for Delta Rib Delta Rib III Nor Clad Strata Rib 2 Corrugated 3 8 HEM 1 2 3 3 8 HEM 3 4 3 8 HEM 6 2 GUNNABLE CAULK ANCHOR BY OTHERS REGLET RG16 GUNNABLE CAULK SIDE CHIMNEY CH18 BUTYL MASTIC TAPE ASC S...

Страница 40: ...LLC 6 MIN 2 1 2 6 12 3 8 HEM 1 2 3 3 8 HEM 3 4 GUNNABLE CAULK ANCHORS BY OTHERS REGLET RG16 GUNNABLE CAULK UPHILL CHIMNEY CH16 BOTTOM POLYETHYLENE CLOSURE SET IN SEALANT ALL AROUND ASC S LIGHT GAUGE R...

Страница 41: ...3 8 HEM 5 5 3 1 2 3 4 3 8 HEM 3 8 HEM GUNNABLE CAULK ANCHORS BY OTHERS REGLET RG16 GUNNABLE CAULK TOP POLYETHYLENE CLOSURE SET IN SEALANT ALL AROUND DOWNHILL CHIMNEY CH17 ASC S LIGHT GAUGE ROOFING 3 1...

Страница 42: ...vision of ASC Profiles LLC Valley Top End FIELD MITER AND ASSEMBLE USE EMSEAL CLOSURE TO CLOSE OFF VALLEY FLASHING ASC S LIGHT GAUGE ROOFING ROOFING NAIL 2 ROWS OF BUTYL MASTIC TAPE VALLEY V1 INSTALL...

Страница 43: ...Nor Clad Strata Rib 2 Corrugated Valley Dormer FIELD MITER AND ASSEMBLE ONTO FLAT STOCK USE EMSEAL CLOSURE TO CLOSE OFF VALLEY FLASHING ASC S LIGHT GAUGE ROOFING ROOFING NAIL 2 ROWS OF BUTYL MASTIC T...

Страница 44: ...NABLE SEALANT ASC S LIGHT GAUGE ROOFING 2 14 WOOD SCREW SEE ILLUSTRATION ON PAGE 7 Panel End Lap Long Panel End Lap For panels 28 ft or longer 12 2 2 10 12 x 1 PANCAKE HEAD 2 ROWS BUTYL MASTIC TAPE OR...

Страница 45: ...2 SNIP HERE OPEN THE HEM OF BOTH FLASHINGS TO BE JOINED USING A SCREWDRIVER OR SCRATCH AWL REMOVE THIS MATERIAL FROM THE INSIDE FLASHING ONLY RE CLOSE HEMS WITH DUCKBILL PLIERS CAULK AND RIVET AS REQ...

Страница 46: ...osures left out for clarity Place inside closure behind panel at C metal C 1 or base trim B1 C1 B1 Wall Details Window Door Trim Corner 3 8 HEM 1 7 8 2 1 8 1 1 2 3 8 HEM 2 ASC S LIGHT GAUGE WALL PANEL...

Страница 47: ...closures left out for clarity Place bottom closure behind panel at base trim and top closure on top of sheet behind C1 at panel top if required Wall Details Top and Bottom Trim 3 8 HEM 1 7 8 2 1 8 1...

Страница 48: ...24 O C MAX INSIDE CORNER IC1 1 9 WOOD SCREW OR 2 14 WOOD SCREW SEE ILLUSTRATION ON PAGE 7 IC1 Procedures Open framing shown If installing over plywood use a 14 x 1 woodscrew for panel attachment Nor C...

Страница 49: ...W SEE ILLUSTRATION ON PAGE 7 3 12 x 3 4 STITCH SCREW OR 4 14 x 7 8 LAP SELF DRILLER 24 O C MAX Wall Details Outside Corner OC1 OC2 Procedures Open framing shown If installing over plywood use a 14 x 1...

Страница 50: ...cramento California 2110 Enterprise Boulevard West Sacramento CA 95691 Salem Oregon 4063 Salem Industrial Drive NE Salem OR 97303 Customer Service Center 800 272 7023 503 390 7174 Spokane Washington 4...