12 - SET-UP INSTRUCTIONS
48
Alt= to hide template information
Alt+ to display template information
Template Name: OML_1_col
Rac 0-00000
Template Date: 1997_02_12
PLOW BEAM ASSEMBLY
RD99N001
Use a chain hoist and lifting strap to place the plow beam assembly on certified safety stands.
Bottom Assembly and Installation
1. PLOW BEAM ASSEMBLY
3. CHAIN HOIST
2. SAFETY STAND
4. SAFETY STRAP
2
2
1
3
4
MA10005
Assemble the moldboard, shin and share to the steel
frog. Tighten all bolts to the specified torque in the
torque chart.
1. SHIN
3. THROW AWAY SHARE
2. STEEL FROG
4. MOLDBOARD
4
3
1
2
TRASH PLATE (OPTIONAL)
RD99N012
RD99N013
Install the trash plate bracket on the steel frog and
tighten the bolts a small amount. Install the trash
plate and the trash plate bolts. Tighten all bolts to the
torque specified in the torque chart.
1. TRASH PLATE BRACKET
3. TRASH PLATE
2. BRACKET BOLTS
4. TRASH PLATE BOLTS
1
2
4
3