
Chapter 2
ATCA-7480 Installation and Use (6806800T17A)
43
Hardware Preparation and Installation
2.1
Unpacking and Inspecting the Blade
Shipment Inspection
To inspect the shipment, perform the following steps.
1. Verify that you have received all items of your shipment:
ATCA-7480 blade
Any optional items ordered
2. Check for damage and report any damage or differences to the customer service.
3. Remove the desiccant bag shipped together with the blade and dispose of it
according to your country’s legislation.
2.2
Environmental and Power Requirements
In order to meet the environmental requirements, the blade has to be tested in the system in
which it is to be installed.
Damage of Circuits
Electrostatic discharge and incorrect blade installation and removal can damage circuits or
shorten their life.
Before touching the blade or electronic components, make sure that you are working in an
ESD-safe environment.
The blade is thoroughly inspected before shipment. If any damage has occurred during
transportation or any items are missing, contact our customer's service immediately.
Содержание ATCA-7480
Страница 1: ...ATCA 7480 Installation and Use P N 6806800T17A February 2015...
Страница 24: ...ATCA 7480 Installation and Use 6806800T17A About this Manual 24 About this Manual...
Страница 30: ...ATCA 7480 Installation and Use 6806800T17A Safety Notes 30...
Страница 36: ...ATCA 7480 Installation and Use 6806800T17A Sicherheitshinweise 36...
Страница 42: ...Introduction ATCA 7480 Installation and Use 6806800T17A 42...
Страница 64: ...Hardware Preparation and Installation ATCA 7480 Installation and Use 6806800T17A 64...
Страница 82: ...Controls Indicators and Connectors ATCA 7480 Installation and Use 6806800T17A 82...
Страница 98: ...Functional Description ATCA 7480 Installation and Use 6806800T17A 98...
Страница 222: ...BIOS ATCA 7480 Installation and Use 6806800T17A 222...
Страница 326: ...Replacing the Battery ATCA 7480 Installation and Use 6806800T17A 326...
Страница 329: ......