![ARRI ARTEMIS 2 Скачать руководство пользователя страница 75](http://html.mh-extra.com/html/arri/artemis-2/artemis-2_user-manual_2975796075.webp)
Installation and Operation
75
8.7.3 Battery Mounting System
Installation BMS-2
1. Place the Battery Mount on the BMS Base.
ATTENTION
Make sure the location pin is aligned with the receiver hole and that the pogo pins line up with the
receiver pads on the circuit board.
2. Use the 3mm allen wrench to tighten all four screws.
8.7.4 Battery Hanger Module
Mounting Battery Mounts to the BHM-2
1. Open the rod clamp wing nut.
2. Positioning the battery mount on the ø19 mm rods.
3. Tighten the clamp wing nut.
Содержание ARTEMIS 2
Страница 1: ...TRINITY 2 System U S E R M AN U A L 01 09 2022 ...
Страница 6: ...Content 6 10 Transportation and Storage 89 11 Disposal 90 12 ARRI Service Contacts 91 13 Appendix 93 ...
Страница 10: ...About the product 10 TRINITY Head 2 TRH 2 ...
Страница 18: ...About the product 18 5 4 Pin Out ARTEMIS 2 TRINITY 2 ...
Страница 25: ...Overview 25 7 Overview ...
Страница 26: ...Overview 26 7 1 TRINITY 2 Head Overview Front right view ...
Страница 27: ...Overview 27 Back left view ...
Страница 28: ...Overview 28 Junction Box right side Junction Box left side ...
Страница 29: ...Overview 29 Front panel Panel Right Panel Back ...
Страница 34: ...Overview 34 ...
Страница 35: ...Overview 35 7 4 Master Grip Overview ...
Страница 40: ...Overview 40 7 6 Top Stage and Bottom Stage Overview ...
Страница 45: ...Overview 45 7 8 Battery Mounting System Overview ...