Beams                  
Installation Guide

METALWORKS 

Содержание MetalWorks

Страница 1: ...MetalWorks Modular Beams Installation Guide M E T A L W O R K S...

Страница 2: ...rea It is important to ensure that the tiles are not subjected to any mechanical influences such as damage caused by the underlying surface Ceiling tiles delivered on pallets should be stored in their...

Страница 3: ...direction location and spacing of the Primary Beams required for the project Primary Beams are typically oriented perpendicular to the roof purlins or joists 2 4 Modular Beams Suspension Beam Layout...

Страница 4: ...ket is assembled as per image in Fig 1 page 5 The Top Plate of the Clamping Bracket must have wings positioned facing downward Finger tighten in position by turning the top of the eye bolt For 50mm Be...

Страница 5: ...ing out see Fig 3 2 8 Cutting Options Beam sections are to be cut to specified length on site using an aluminium drop saw MetalWorks Modular Beams Installation Guide Fig 1 Locating the Clamping Bracke...

Страница 6: ...nd specification Screw fix accordingly as per Fig 6 7 Fig 4 Location of Hook Over End Cap into 25x100mm Cross Beam Fig 5 Location of Hook Over End Cap into 50x100mm Cross Beam Fig 6 Fixing 25x100mm Cr...

Страница 7: ...ds of use colour variations may occur when individual tiles are replaced Armstrong paint coatings Armstrong ceiling Beams are finished with a polyester powdercoat Cleaning of Armstrong METALWORKS ceil...