background image

CE Certification
Heat Input

max/min   kW

25.6/11.0

Heat Output

max/min   kW

23.1/9.2

Efficiency of Nominal Heat Input

%

90.2

Efficiency at 30% of Nominal Heat Input

%

87.8

Heat Loss to the Casing (³T=50°C)

%

1.2

Flue Heat Loss with Burner Operating

%

8.6

Flue Heat Loss with Burner Off

%

0.4

Maximum Discharge of Fumes (G20-G25) Kg/h

59

Residual Discharge Head

mbar

1.15

Consumption at Nominal Capacity (G20-G25) m

3

/h

2.72/3.32

Gas Consumption after 10 Minutes*

m

3

0.32/0.39

(15°C, 1013 mbar) (G30-G31)

Kg/h

2.02/2.00

Temp. of exhaust fumes at nominal

capacity (G20-G25)

°C

137

CO

Content

%

5.8

O

Content

%

9.2

CO Content

ppm

32

Minimum Ambient Temperature

°C

+5

Head Loss on Water Side (max) (³T=20°C) mbar

200

Residual Head of System

bar

0.25

Heating Temperature 

max/min  °C

82/42

Domestic Hot Water Temperature 

max/min  °C

56/36

D.H.W. Flow Rate ³T=35°C

l/min

9.5

D.H.W. Flow Rate ³T=35°C

gal/min

2.1

D.H.W. Minimum Flow Rate

l/min

2.6

Pressure of Domestic Hot Water

max/min bar

6/0.2

Expansion Vessel Capacity

l

7

Expansion Vessel Pre-load Pressure

bar

1

Maximum Water Content in System

l

145

Maximum Heating Pressure

bar

3

Nominal Pressure Natural Gas (G20-G25) mbar

20-25

LPG             (G30-G31) mbar

30-37

Electrical Supply

V/Hz

230 / 50

Power Consumption

W

150

Protection Grade of Electrical System

IP

44

Internal Fuse Rating

FAST 2 AT

Weight

Kg.

47

G.C. Number

47-116-10

4

B023

1.2

Technical Information

chamber visually.

- Visual check of the combustion: clean burners if necessary.
- With reference to point 3, dismantle and clean the combustion chamber if

necessary.

- With reference to point 4, dismantle and clean the injectors if necessary.
- Visual check of the primary heat exchanger:

- check for overheating of the exchangers fins;
- clean the exhaust side of the exchanger and fan if necessary.

- Regulate the gas pressure, ignition pressure, partial flame, maximum 

flame.

- Check proper operation of the heating safety system:

- maximum safety temperature;
- maximum safety pressure.

10 - Check the proper operation of the gas safety system:

- gas or flame safety device;
- gas valve safety device.

11 - Check that the electrical connections have been made in compliance with

the instructions shown in the installation instructions.

12 - Check the efficiency of the hot water supply (flow and temperature).
13 - Check general operation of the appliance.
14 -  Check the exhaust system for the combustion products.

29.8/12.0
27.3/10.1

91.6
88.3

1.3
7.1
0.4

62

1.4

3.16/3.86
0.37/0.45
2.35/2.32

128

6.6

8.0

34
+5

200

0.25

82/42
56/36

11.2

2.5
2.6

6/0.2

7
1

145

3

20-25
30-37

230 / 50

190

44

FAST 2 AT

47

47-116-12

A/23 MFFI

A/27 MFFI

*Calculated at 70% maximum output

Содержание EURO COMBI 47-116-10

Страница 1: ...A 23 MFFI A 27 MFFI G C N 47 116 10 47 116 12 Installation Instructions Type C Boilers LEAVE THESE INSTRUCTIONS ADJACENT TO THE GAS METER Country of destination GB...

Страница 2: ...10 Room Thermostat Connection 2 11 Electrical System Diagrams 2 12 Water Circuit Diagrams 3 COMMISSIONING 3 1 Initial Preparation 3 2 Removing the Front Panel 3 3 Control Panel 3 4 Initial Start up 3...

Страница 3: ...rse of the control panel The gas with which this appliance operates is also shown on the label at the bottom of the boiler Do not install this appliance in a damp environment or close to equipment whi...

Страница 4: ...er Consumption W 150 Protection Grade of Electrical System IP 44 Internal Fuse Rating FAST 2 AT Weight Kg 47 G C Number 47 116 10 4 B023 1 2 Technical Information chamber visually 4 Visual check of th...

Страница 5: ...8 Spark Generator 9 Diverter Valve 10 Main Circuit Temperature Probe 11 Main Circuit Flow Switch 12 Diverter Valve Microswitch 13 Filter Seat 14 Drain Valve 15 Secondary Heat Exchanger 16 Safety Valv...

Страница 6: ...om sealed appliance is installed in a room containing a bath or shower the boiler and any electrical switch or appliance control utilising mains electricity should be situated so that it cannot be tou...

Страница 7: ...ing Return 3 4 2 3 Overall Dimensions 890 3 6 5 A B D E C 465 In order to allow for access to the interior of the boiler for maintenance purposes the boiler must be installed in compliance with the mi...

Страница 8: ...as follows The yellow green wire should be connected to the terminal marked with the earth symbol make sure to re use the ferrule mounted on the other supply cord The blue wire should be connected to...

Страница 9: ...t loss and avoid freezing Particular attention should be paid to pipes passing through ventilated spaces in roofs and under floors By pass The appliance includes an automatic by pass valve which prote...

Страница 10: ...water carrying pipe work and must be used for pipe work carrying drinking water 2 9 Flue Connections Flue System The provision for satisfactory flue termination must be made as described in BS 5440 1...

Страница 11: ...rminal 1200 J From an opening in the car port e g door window into dwelling 1200 K Vertically from a terminal in the same wall 1500 L Horizontally from a terminal in the same wall 300 11 B023 A BC D E...

Страница 12: ...perforated ring 2 Use a tool to grasp the lid and remove it completely 3 Clean any burrs or sharp edges with a knife or an appropriate tool In Fig 2 10 below several different types of flue systems ar...

Страница 13: ...ues for each curve as indicated in the table 4 The exhaust pipe must extend at least 0 5 m above the ridge of the roof if it is located on a side other than that for the air intake this is not obligat...

Страница 14: ...itching wires from the time clock following points 1 7 above 10If using a time clock and room thermostat these must be connected in series as per points 1 9 above Note Only a two wire type room thermo...

Страница 15: ...stment P Time Clock Connection Q On Off L E D R On Off Switch S Interface Wire for P C B s T Relay Motorised Valve U Ignitor Relay V Gas Valve Relay W Fan Relay X Circulation Pump Relay Aa Adaptor Bri...

Страница 16: ...16 B023 A 23 MFFI A 27 MFFI EX C MI FFI 8 A 23 MFFI A 27 MFFI...

Страница 17: ...full turn and leave open permanently Close all air release valves on the central heating system Gradually open valve s at the filling point filling loop connection to the central heating system until...

Страница 18: ...ocated on the top edge of the panel 2 Lift and unhook the panel system sect 3 4 and run it until the temperature has reached the boiler operating temperature The system must then be immediately flushe...

Страница 19: ...ves are open 4 Turn on the gas cock and check the seals on the connections including the one for the burner making sure that the meter does not signal the passage of gas Check the connections with a s...

Страница 20: ...setting factory set at the maximum value unless indicated otherwise on the adhesive sticker located in proximity to the potentiometer The connection for the diagnostic device TCS TCS2 G20 5 5 mm c a G...

Страница 21: ...low 0 C during the winter This makes repeated draining of the entire system unnecessary Draining the domestic hot water system Whenever there is the danger of the temperature dropping below the freezi...

Страница 22: ...als replacement of any faulty gas seals 3 Visual check of the entire unit 4 Visual check of the combustion process and cleaning of the burners if needed 5 If called for by check no 3 dismantling and c...

Страница 23: ...n the junction box If a room thermostat is not required on Zone 2 insert a link between 6 8 on the junction box V4043H VALVE BROWN 8 BLUE 2 GREY 9 ORANGE 10 GREEN YELLOW 3 Honeywell ST 699B 1002 6 3 N...

Страница 24: ...10 on the junction box If a room thermostat is not requied on Zone 1 insert a link between 4 5 on the junction box If a room thermostat is not requied on Zone 2 insert a link between 6 8 on the junct...

Страница 25: ...NOTES 25 B023...

Страница 26: ...26 B023 NOTES...

Страница 27: ...27 B023...

Страница 28: ...Commercial subsidiary MTS GB LIMITED MTS Building Hughenden Avenue High Wycombe Bucks HP13 5FT Telephone 01494 755600 Fax 01494 459775 Technical Service Hotline 01494 539579 Cod 23 99 84 1260 112 B02...

Отзывы: