18
Tensor
6.3
Additional auxiliary switches S1-S4
(add-on board)
The additional board ZW provides outputs for up to four additional
bistable relays with preservation of the switching status in the deener-
gized condition, to be freely programmed.
Switching points
It can be defi ned for each relay a left and right switching point.
While moving from LEFT to RIGHT applies to the transitions:
-
SPL
left switching point changes from OFF to ON
-
SPR
right switching point changes from ON to OFF
Example switching pattern
By defi ning and positioning of these two switching points different shift pattern can be freely defi ned.
Example switching pattern inverted
6 7 8 9 10 11 12 13 14 15 16 17
L
N
2 3
M
85...265 V (AC)
18 19 20
Option
Option
S2
S1
S3
S4
Poti
left end position
left end position
right end position
right end position
OPEN
OPEN
CLOSED
CLOSED
Содержание Tensor Zone 2/22
Страница 43: ......