Quick Start Guide
Hydro Pro 36 (926055 s/n 101 & up)
•
Step 1: Unfold Handlebar
•
Step 2: Install Discharge Chute
•
Step 3: Install Chute Control Assembly
•
Step 4: Install Discharge Chute Rod
•
Step 5: Install Remote Deflector Cable
•
Step 6: Check Function of Dual Handle Interlock
•
Step 7: Check Tire Pressure
•
Step 8: Adjust Skid Shoes
•
Step 9: Check Auger Gearcase Oil
•
Step 10: Check Engine Crankcase Oil
•
Step 11: Fill Engine Fuel Tank
•
Step 12: Start Engine
•
Step 13: Stop Engine
READ AND UNDERSTAND ALL INSTRUCTION, WARNING, AND DANGER LABELS.
IMPORTANT:
READ OPERATOR’S MANUAL AND ENGINE MANUAL
THOROUGHLY AND FOLLOW THE IMPORTANT SAFE OPERATION PRACTICES
BEFORE OPERATING.
Содержание Hydro Pro 36
Страница 10: ...Step Seven Check Tire Pressure Check tire pressure and adjust to the pressure listed on tire sidewall...
Страница 12: ...Check oil level in auger gearcase see Check Auger Gearcase in Owners Manual Step Nine Check Auger Gearcase Oil...
Страница 14: ...Fill fuel tank DO NOT OVERFILL See FILLING FUEL TANK in Owners Manual Step Eleven Fill Engine Fuel Tank...
Страница 15: ...Step Twelve Starting the Engine...
Страница 17: ...Starting Engine Step B Fuel Valve Turn the fuel shut off valve to the ON position...
Страница 18: ...Starting Engine Step C Key Insert the key and turn to the ON START position...