7
PARTS NEEDED
TOOLS NEEDED
Assemble the mounting post upper clamp [K] to the top plate [L] on the outer edge of
the frame [C]. Secure with four washers [S], two hex bolts [Q] and two nylock nuts [R].
Hand tighten. Later adjustment may be necessary to line up with the lower mounting
posts [M].
Repeat with the remaining mounting
post set on the other side of the frame.
Q
S
L
K
S
R
1
C
INSTALL MOUNTING POST (FIG.
1
-
2
)
2
+
STEP
4
1
/
2
in. Box
Wrench
OR
OR
1
/
2
in. Socket
Wrench
Adjustable
Wrench
L
K
SPRING CLIP
INSTALLED AT FACTORY
KNOB WITH M8 STUD
4MM ALLEN WRENCH
M8 X 30 HEX BOLT
M8 WASHER
SPRING CLIP
INSTALLED AT FACTORY
KNOB WITH M8 STUD
4MM ALLEN WRENCH
M8 X 30 HEX BOLT
M8 WASHER
SPRING CLIP
INSTALLED AT FACTORY
KNOB WITH M8 STUD
4MM ALLEN WRENCH
M8 X 30 HEX BOLT
M8 WASHER
SPRING CLIP
INSTALLED AT FACTORY
KNOB WITH M8 STUD
4MM ALLEN WRENCH
M8 X 30 HEX BOLT
M8 WASHER
Q
R
S