
R-20 SM
2.2. Installation procedure
1.
Install the valve as indicated by the arrow on the valve bonnet, indicating flow direction [
1
].
2.
It is recommended to install isolation valves [
2
] upstream and downstream of the control valve.
3.
Turn the
3
-way manual selector ball valve [
4
] to Auto position.
4.
Check for leaks; tighten bolts & fittings, if necessary.
5.
Close the
2
isolation valves.
Содержание Eliptix R-20 SM Series
Страница 13: ...R 20 SM 6 DIMENSIONAL DRAWING...