background image

A  Front panel

  

B  Back panel
C  Lock Bolt and Fixed Screws 

D  Rubber Mat and Fixed board

 

(4 long screws to attach front panel)

 (2 short screws to attach back panel)

 E  Latch Strip
F  Emergency keys and  RFID card

  1. Door type: Wooden door;    Door thickness: 35-50mm;                                         

  2. Door open method: left-hand and right-hand. Please verify and adjust it before installation.                    

Note 1: Make sure you install 

new Strike Plate on door frame 

and cut hole appropriately. It 

maybe necessary to enlarge 

existing hole.

Note 2: Make sure the Front 

Panel on door frame and cut 

hole appropriately and buttom 

brace screw need through the 

latch hole.

Note 3: 

Latch and Back Thumb 

Turn should be in unlocked 

position.

L100II  INSTALLATION INSTRUCTIONS

A

B

C

D

E

F

  3. Please follow the below steps to change the handled:                    

1  Left handle

2  Remove the 

handle’s screw.

3  Change handle 

direction and replace 

the screw into hole of 

the handle.

4   Right handle  

Right handle  

Left handle

  

  

* See Note 1

Step 1

Insert Latch Strip in door is shown in

the diagram. 

Step 2

Install the Front Panel with Rubber 

Mat on the door and route wire loom 

ABOVE the Latch.

* See Note 2

Step 3

Install Fixed Board with Rubber Mat 

and route wire loom through left hole.

Recommendation: 

Install 2 screws

 on the Fixed Board to fixed position.

Step 4

Install the Lock Bolt through the Latch 

Strip and make sure the Lock Bolt is

pluged in the Front Panel.

Step 5

Connect the wire loom from the Front 

Panel to Back Panel and remove the 

battery cover.

Step 6

Remove screws which have been

installed on the Fixed Board before,

and fasten Back Panel to the fixed 

board. 

DO NOT OVER TIGHTEN IT.

Step 7

Fasten last two screws on the Back 

Panel.Turn the handle to make sure 

that you can unlock the door with the 

handle. Then tighten all the screws on

the lock and Install alkaline batteries 

and replace the battery cover.

* See Note 3

Preparation Before Installation 

Product And Accessories

Installation 

Отзывы: