Argos New Sywell 425/8700 Скачать руководство пользователя страница 1

MADE IN 

BRITAIN 

Dimensions

Width - 101.9cm

Depth - 59.5cm 

Height - 171.1cm

New Sywell - 

2 Door Sliding Robe

Assembly Instructions -

 Please keep for future reference

If you need help or have damaged or missing parts, call the 

Customer Helpline: 03456 400800

Issue 1 - 28/05/15

Important -

 Please read these instructions fully before starting assembly

ALR3192

427/1237

425/8700
427/1770

427/1244

Содержание New Sywell 425/8700

Страница 1: ...r Sliding Robe Assembly Instructions Please keep for future reference If you need help or have damaged or missing parts call the Customer Helpline 03456 400800 Issue 1 28 05 15 Important Please read t...

Страница 2: ...and maintenance Only clean using a damp cloth and mild detergent do no use bleach or abrasive cleaners From time to time check that there are no loose screws on this unit This product should not be d...

Страница 3: ...03456 400800 quoting the reference numbers below 4 5 Left Side DF3581 171 1 x 59 2cm Right Side DF3582 171 1 x 59 2cm Top Base DF3584 98 9 x 59cm x 2 Shelf DF3587 48 7 x 49cm x 2 Rail DF3588 48 7 x 12...

Страница 4: ...wel F901 x 12 Large locking nut F900 x 24 Buffer bracket F261 x 1 Q Top glide F956 x 4 M Mushroom Head Pin F260 x 4 Double metal dowel F566 x 4 S Rail Holder F891 x 4 H Nail screw F277 x 10 Back holde...

Страница 5: ...astic tracks until they are fitted flat to the surface of the panel Turn the top and the base panels over Tap 4 wooden dowels into each of the top and base panels Note Wooden dowels must not stick out...

Страница 6: ...ew and into the mark hole drilled in the divider Make sure that it is fitted straight in line with the panel edges and then fit another screw using the lower hole Turn the divider over Fit another rai...

Страница 7: ...es of the top and base Fit the top and base to the divider Attach the top and the base to the divider using 4 screws 4 4 3 E 4 4 3 Top Base C C A A C C A Prepare 1 of the shelves Tap 2 wooden dowels i...

Страница 8: ...fitted to the shelf Note Turn the large locking nuts as far as they will go more than 1 2 a turn 5 3 R 3 5 3 5 C C 5 a b 3 R D C R D Finished front edge Prepare the left side Screw 6 metal dowels into...

Страница 9: ...screwdriver to tighten the 2 large locking nuts fitted to the rail Note Support the rail until the left side has been fitted in the next step R 3 6 C 6 b 6 Finished front edge Plain chipboard surface...

Страница 10: ...m head pins into the holes on the outside of the left side b Use a screwdriver to tighten the 8 large locking nuts fitted to the top base shelf and rail P 1 C 4 4 5 6 A Prepare the other shelf Tap 2 w...

Страница 11: ...side Screw 6 metal dowels into the right side Note Tighten the metal dowels up fully against the panels Fit a rail holder by screwing through the top hole with screw and into the mark hole drilled in...

Страница 12: ...the rail until the right side has been fitted in the next step Step 14 Finished front edge 6 3 Plain chipboard surface 6 6 3 C 6 Fit the right side a Push the right side onto the assembly Tap 2 mushr...

Страница 13: ...ot nail where the 2 backs meet c Push the nail screws through the back holders and tap them down between the 2 backs and into the back edge of the divider Keep tapping the nail screws in until the bac...

Страница 14: ...ides and Screw the 2 feet down the middle of the base 1 near the front and 1 near the back using screws Carefully stand the unit up for the next step V 1 2 V V V V 1 2 Warning The unit is heavy Lift w...

Страница 15: ...ach one with 2 screws M N 8 8 I N Prepare the left hand door Important Check that the holes are in the same place as the diagram Fit the buffer bracket onto the other door using 2 screws Push 2 top gl...

Страница 16: ...e information about fitting the doors please refer to the relevent diagrams To fit the top of the Doors This lug fits into the groove in the track The switch in the top glides must be in this position...

Страница 17: ...evel front to back and side to side in the 3 positions shown Use suitable packing pieces not supplied to make the unit level BEFORE making any adjustment as shown To raise the door loosen the screws a...

Страница 18: ...Assembly Instructions 17 Step 22 Attach the handles Attach a handle to each of the doors using screws T F 8 F F T T 8 8...

Страница 19: ...le overbalancing we recommend that this unit is secured to a suitable wall by fitting of the overbalance protector kit to the unit or an alternative fixing method of your choice Wall fixings are not s...

Страница 20: ...ALR3192...

Отзывы: