Since three line-to-neutral voltages and the zero sequence voltage (U4) are connected, this application
uses the voltage measurement mode "3LN+U0" (see the image below). Additionally, there are three
phase currents and the residual current (I01) are also connected. The digital inputs are connected to
indicate the breaker status, while the digital outputs are used for breaker control.
Figure. 7.2 - 239. Application example and its connections.
7.3 Two-phase, three-wire ARON input connection
This chapter presents the two-phase, three-wire ARON input connection for any AQ-200 series IED
with a current transformer. The example is for applications with protection CTs for just two phases. The
connection is suitable for both motor and feeder applications.
A
AQ
Q-F205
-F205
Instruction manual
Version: 2.04
372
© Arcteq Relays Ltd
IM00013
Содержание AQ F205
Страница 1: ...AQ F205 Feeder protection IED Instruction manual ...
Страница 2: ......
Страница 379: ...Figure 7 4 245 Example block scheme A AQ Q F205 F205 Instruction manual Version 2 04 Arcteq Relays Ltd IM00013 377 ...
Страница 389: ...Figure 8 7 254 Device installation A AQ Q F205 F205 Instruction manual Version 2 04 Arcteq Relays Ltd IM00013 387 ...