Table. 5.5.1 - 213. Register content.
Date
and time
Event code
Trigger currents
Time to
CTSact
Fault type
Used
SG
dd.mm.yyyy
hh:mm:ss.mss 3328-3459 Descr.
The phase currents (L1, L2 & L3), the
residual currents (I01 & I02), and the
sequence currents (I1 & I2) on trigger time.
Time
remaining
before alarm
activation.
The status
code of the
monitored
current.
Setting
group
1...8
active.
5.5.2 Voltage transformer supervision (60)
Voltage transformer supervision is used to detect errors in the secondary circuit of the voltage
transformer during fuse failure. This signal is mostly used as an alarming function or to disable
functions that require adequate voltage measurement.
Figure. 5.5.2 - 227. Secondary circuit fault in phase L1 wiring.
The following figure presents a simplified function block diagram of the voltage transformer
supervision function.
A
AQ
Q-F205
-F205
Instruction manual
Version: 2.04
© Arcteq Relays Ltd
IM00013
325
Содержание AQ F205
Страница 1: ...AQ F205 Feeder protection IED Instruction manual ...
Страница 2: ......
Страница 379: ...Figure 7 4 245 Example block scheme A AQ Q F205 F205 Instruction manual Version 2 04 Arcteq Relays Ltd IM00013 377 ...
Страница 389: ...Figure 8 7 254 Device installation A AQ Q F205 F205 Instruction manual Version 2 04 Arcteq Relays Ltd IM00013 387 ...