11 Technical data
11.1 Mounting and installation
Table. 11.1 - 7. Technical data for relay mounting and installation (AQ-101 & AQ-101LV).
Panel:
- material
- thickness (min...max)
metal
1.0...5.0 mm (0.04...0.20 in)
Panel mounting:
- screw type
- key size
- tightening torque (min...max)
ISO 14581 M4x12, galvanized
Torx T20
1.5...2.0 N·m (13.3...17.7 lbf·in)
Grounding:
- nut type
- key size
- tightening torque (min...max)
DIN934-M5 galvanized
8
2.5...3.0 N·m (22.1...26.6 lbf·in)
Connectors X1 and X2 :
- connector type
- wire cross section (min...max)
- minimum stripping length
- screw tightening torque (min...max)
Phoenix Contact MSTB 2,5/15-ST-5,08 BD:1-15
0.2...2.5 mm
2
(24...13 AWG)
7 mm (0.28 in)
0.5...0.6 N·m (4.4...5.3 lbf·in)
Fiber connectors:
- nut tightening torque
light finger tightening
Table. 11.1 - 8. Technical data for relay mounting and installation (AQ-101D & AQ-101DLV).
Panel:
- material
- thickness (min...max)
metal
1.0...5.0 mm (0.04...0.20 in)
Panel mounting:
- screw type
- key size
- tightening torque (min...max)
ISO 14581 M4x12, galvanized
Torx T20
1.5...2.0 N·m (13.3...17.7 lbf·in)
Grounding:
- nut type
- key size
- tightening torque (min...max)
DIN934-M5 galvanized
8
2.5...3.0 N·m (22.1...26.6 lbf·in)
Connectors X1 and X2:
- connector type
- wire cross section (min...max)
- minimum stripping length
- screw tightening torque (min...max)
Phoenix Contact FRONT-MSTB 2,5/15-STF-5,08
0.34...2.5 mm
2
(24...12 AWG)
10 mm (0.39 in)
0.5...0.6 N·m (4.4...5.3 lbf·in)
Fiber connectors:
- nut tightening torque
light finger tightening
11.2 Operating times
Table. 11.2 - 9. Technical data for relay operating times.
Trip time using mechanical trip relays
7 ms*
Reset time (arc light stage)
2 ms
A
AQ
Q-101 (A
-101 (AQ
Q-101D
-101D))
Instruction manual
Version: 2.01
© Arcteq Relays Ltd
IM00006
37
Содержание AQ 102
Страница 1: ...AQ 101 AQ 101D Arc flash protection unit Instruction manual ...
Страница 2: ......