Archgard NORTHFIRE 3400 Скачать руководство пользователя страница 27

Northfire 3400

  

 

 

 

 

 

 

 

27

 

SERVICING 

Cont... 

IF YOUR GLASS BREAKS 

CONVERTIBLE PILOT ORIFICE 

In the event your glass cracks or breaks, it must be replaced by the exact same size and mate-
rial. It is made from high temperature ceramic material. See replacement parts list and contact 
your nearest Archgard dealer.  
 

Remove door and carefully remove all traces of glass and gasket material. See page 16 for 
glass door removal.  

Clean glass fame & ensure no “old” gasket or glue remains. 

 

Install new glass and gasket. The “thicker” side of the gasket fits against the fireplace 

 

      opening. 

Hold glass in place by using the sealer between gasket and door. Use sparingly so that no 
excess  will  be  visible.  DO  NOT  PUT  ANY  SEALER  BETWEEN  GLASS  AND  UNIT 
OPENING. 
Replace the door carefully making sure all clamps are closed. 

The pilot assembly is convertible to the type 

of gas being used; simply unscrew the body 

by using a 7/16” (11 mm) wrench turn a 

¼

 

open then push the small metal tab across to 
the other side of the body and retighten. 

Call 

your local Authorized Archgard Dealer to 
purchase  the  correct  fuel  conversion  kit 
for your gas appliance.

 

7/16” (11 mm) 

WRENCH 

(HERE) 

Содержание NORTHFIRE 3400

Страница 1: ...f the information in this manual is not followed exactly fire or explosion may result causing property damage personal injury or loss of life Do not store or use gasoline or other flammable vapors and...

Страница 2: ......

Страница 3: ...stibles 8 Possible Fireplace Locations 9 Venting Instructions 10 15 Gas Connection 16 Glass Door Removal 17 Log Placement 18 Fan and Valve Diagrams 20 Initial Start Up 21 Maintenance 22 Troubleshootin...

Страница 4: ...the manual carefully prior to installation and operation of the appliance Proper installation operation and maintenance of the appliance will provide you with many years of enjoyment CAUTION Due to hi...

Страница 5: ...e appliance when installed must be electrically grounded in accordance with local codes or in absence of local codes with the National Electrical Code ANSI NFPA 70 or the Canadian Electrical Code CSA...

Страница 6: ...NVECTION FAN SPEED CONTROL TOP LOUVRES GLASS DOOR FRONT VIEW Except for the vent connector locations the rear vented and top vented units have the same physical dimensions 23 35 TOP VIEW 6 15 APPLIANC...

Страница 7: ...ENSIONS 34 3 4 16 39 28 36 7 16 56 34 3 4 31 16 If more rigidity is required a stud may be added to the back of the top nailing flange after the fireplace is installed TERMINATION FRAMING 11 10 Please...

Страница 8: ...side side and bottom surface 2 to outside top surface CLEARANCE TO COMBUSTIBLES PRECAUTIONS This appliance must be installed by a qualified gas installer and the installation must conform to the insta...

Страница 9: ...LACE This appliance must be installed in a location that is free of plumbing electrical wiring and heating or air conditioning ducts Select a location that is accessible for venting See APPENDIX A ALL...

Страница 10: ...stries Ltd 9 Support horizontal running vents every 3 ft to prevent it from sagging 10 Wall terminal must be installed a minimum of 12 above grade measured from bottom of terminal VENT TERMINATION 1 S...

Страница 11: ...haracteristics will change Therefore an exhaust restrictor plate is provided by the manufacturer to preserve as much of the original short vent performances as possible on taller vent configurations T...

Страница 12: ...Northfire 3400 12 VENTING INSTRUCTIONS RESTRICTOR INSTALLATION See pg 14...

Страница 13: ...ine of the terminal M Clearance under veranda porch deck or balcony 12 inches 30 cm E Clearance to unventilated soffit F Clearance to outside corner G Clearance to inside corner H Clearance to each si...

Страница 14: ...ng into the formed lip WARNING These restrictors are only to be installed in the vent system if the vent exceeds 4 in vertical height See below which restrictor is required Installing them under any o...

Страница 15: ...ection all the way to make a solid connection Note As this system is a sealed system a high temperature sealing compound must be used to seal the metal to metal joint Vent Pipe Assembly Procedure Appl...

Страница 16: ...ure testing of that system at test pressures in excess of 1 2 psig 3 5 kPa The appliance must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pr...

Страница 17: ...alling door Carefully hook the door onto the tabs on the top of the firebox Connect the door latches at the bottom of the door and close latches Install the top bottom louvers or optional front If the...

Страница 18: ...the log resting on the pilot shield so as to allow secondary air to pass under the log Step 2 Place rear left log on pin numbers 3 and 4 with the right side of the log resting on the rear right log s...

Страница 19: ...t log on pin numbers 1 and 2 as shown Step 4 Place right front log on pin numbers 9 and 10 as shown REPLACEMENT LOGS 310 63400 1 Right Rear Log 310 63400 2 Left Rear Log 310 63400 3 Left Front Log 310...

Страница 20: ...line through the left side of the fireplace and into the bottom of the gas fireplace Be sure to connect a grounding wire to the side of gas fireplace Use any screw hole on the side for this purpose Sl...

Страница 21: ...label 2 Set the thermostat to the lowest setting 3 Turn off all electric power to the appliance 4 Controls are accessed by opening the bottom louver 5 Push in gas control knob slightly and turn clockw...

Страница 22: ...is job is best done outside the house wearing a dust mask The logs are very fragile take care not to break them After cleaning the logs must be replaced as per the instructions in this manual When rep...

Страница 23: ...e blocked or the gas valve may be defective Pilot will not remain on after being lit 1 Press the control knob all the way in 2 Hold the control knob in for a longer period of time 3 If you are trying...

Страница 24: ...lazy increase primary air by opening the primary air shutter 2 Check for proper placement of the logs and branches See that section in the instruction manual 3 Check for obstruction of the burner por...

Страница 25: ...authorized by Archgard for suitability SERVICING UNDER WARRANTY FLAMES Reference only The left side shows correct adjustment The right side shows yellow sooty flames requir ing increase in shutter op...

Страница 26: ...the set screw inside the tap after you are finish taking pressure readings Check for leaks CHECKING INLET AND OUTLET GAS PRESSURE CHECKING AND ADJUSTING PILOT The pilot flame should have the character...

Страница 27: ...tall new glass and gasket The thicker side of the gasket fits against the fireplace opening Hold glass in place by using the sealer between gasket and door Use sparingly so that no excess will be visi...

Страница 28: ...p and tilt the back up to clear the front of the valve from the opening Replacing the assembly is the reverse of the above instructions REPLACING VALVE PLATE ASSEMBLY Remove the gas component valve pl...

Страница 29: ...st mask The logs are very fragile take care not to break them After cleaning the logs must be replaced as per the instructions in this manual Once a Year have a qualified service technician Completely...

Страница 30: ...OR MOUNITING ON NOVA SIT 820 VALVE 1 EA 308 0013 VALVE NOVA SIT 820 MV HI LOW NATURAL GAS 1 EA 308 0035 REGULATOR PROPANE FOR CONVERTING 308 0013 VALVE TO PROPANE 1 EA 308 0056 THERMOPILE REPLACEMENT...

Страница 31: ...steps for converting are as follows 1 Remove the vent outer shell cover 1 2 Remove the outer collar assembly 2 3 Remove the exhaust collar assembly 3 4 Rotate the exhaust collar assembly and the outer...

Страница 32: ...uthorized Archgard Dealer WHAT TO DO IN THE EVENT OF A PROBLEM Thoroughly read your manual If you cannot solve the problem contact your Archgard Dealer or representative When calling for help please h...

Страница 33: ...me Address City State PC Zip Phone ______ Dealer s Name Address City State PC Zip Phone ______ Installer s Name Address City State PC Zip Phone ______ Why did you choose this product Thank you for pur...

Страница 34: ......

Страница 35: ...Archgard Industries Ltd 7116 Beatty Drive Mission B C V2V 6B4 Canada Website www archgard com...

Отзывы: