
72-DVTE30-2
11
FRAMING DIMENSIONS
C
B
C
A
B
*
This dimension allows the top of
the fireplace to slide under. If
more rigidity is required, a steel
stud may be added to the back
of the fireplace top nailing flange
after the fireplace is installed.
Dimensions
A
* 38” (965
mm)
B
16
-
¼
” (412
mm)
C
38” (965
mm)
TERMINATION
FRAMING
H
I
NOTE:
Be sure to include
¼
”
(6mm) rise per
12” (305
mm) of horizontal length
DIMENSIONS
H
11” (279
mm)
I
10” (254
mm)
D
E
F
G
DIMENSIONS
D
39
-
⅛
”” (994
mm)
E
27
-
⅝
”” (700
mm)
F
38” (965
mm)
G
55
-
¼
” (1403
mm)
CORNER FRAMING
Содержание 72-DVTE30N-2
Страница 4: ...72 DVTE30 2 4 RATING PLATE SAMPLE...
Страница 36: ...72 DVTE30 2 36 LIGHTING INSTRUCTIONS ON RATING PLATE...
Страница 41: ...72 DVTE30 2 41 REMOTE CONTROL SETUP AND OPERATION SIMPLE INSTALLATION Optional handheld remote...
Страница 43: ...72 DVTE30 2 43 REMOTE CONTROL SETUP AND OPERATION cont Fig 3 Battery compartment...
Страница 44: ...72 DVTE30 2 44 REMOTE CONTROL SETUP AND OPERATION cont...
Страница 45: ...72 DVTE30 2 45 REMOTE CONTROL SETUP AND OPERATION cont Not available on all units...
Страница 59: ...72 DVTE30 2 59 NOTES...
Страница 60: ...Archgard Industries Ltd 7116 Beatty Drive Mission B C V2V 6B4 Canada Website www archgard com...