
32
Installation
15.2 Reflective Glass Installation
The following steps highlight the procedure for installing the Reflective Ceramic Glass liner. We recommend using clean cotton gloves
when handling panels. Handle the panels with care as they are delicate. Inspect the panels to ensure that no damage has occurred
inside the package. Please report any damage immediately to your Authorized Archgard Dealer. Clean each panel with a soft cloth as
you install them to remove any fingerprints as high temperatures can bake these prints on permanently.
Before you begin:
• Ensure the gas supply is turned OFF and disconnect the power supply (including backup batteries)
•
Open the Glass Door with Barrier Screen attached (see
Section 6.4
)
•
Remove the log set (if installed - see
Section 16.0
)
Step 4:
Place the other side panel along the remaining side of the
firebox.
Figure 15.1.04:
Step 1:
Place the rear panel in the back of the firebox.
Step 2:
Place the left or right side panel along the corresponding
side of the firebox. The side panels will hold the rear panel in
place.
Figure 15.1.01:
Figure 15.1.02:
Figure 15.1.03:
Step 3:
Install one of the upper panel clips in the top of the firebox
to hold the top of the side panel in place.
Содержание 45-DVFE28LN-1
Страница 66: ...NOTES ...
Страница 68: ......